Similar Projects
FY19 City-Wide Stormwater Box Culvert Rehabilitation
Results
Less than $1,000,000 est. value
Tampa, FL 33600

Drainage Project at Gibsonton Elementary School
Results
Gibsonton, FL 33534

Desilting and Video Inspection
Results
Less than $1,000,000 est. value

Ignacio Haya Park Living Shoreline
Results
Less than $152,876 est. value
Tampa, FL 33600

Drainage Facility Improvements and Drainage Repairs
Results
Less than $1,631,929 est. value
FL

Parking Lot Drainage Project, Raymond James Stadium
Results
Tampa, FL 33607

Rental and Installation of Temporary Cofferdam at Mcmullen Loop
Results
Tampa, FL 33601

Drainage Project at Sulphur Springs Elementary School
Results
Tampa, FL 33604

Drainage Project at Carrollwood Elementary School
Results
Carrollwood, FL 33618

Stormwater Pond Maintenance
Results

District-Wide Maintenance of Mitigation Sites and Stormwater Ponds
Results

Drainage Improvement Project (Chamberlain High School)
Results
Tampa, FL 33612

Construction Services of Roadside Ditch, Canal Cleaning, and Grading Projects
Results
Less than $15,200,000 est. value
Tampa, FL 33601

Stormwater Culverts Construction Contract
Results
$6,500,000 est. value
FL

Pipe Cleaning Drainage Systems
Results
Less than $65,000 est. value
FL

Last Updated 04/01/2020 11:19 AM
Project Title

South Ditch Rehabilitation

Physical Address View project details and contacts
City, State (County) Tampa, FL 33622   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project includes the rehabilitation of an existing approximately 1,025 LF ditch at Tampa Executive Airport. Also included is the installation of 175 SY of revetment mat, six pipe outlet improvements including pipe demolition, installation of reinforced concrete pipe (RCP) and mitered end sections, and 40 LF of fence ditch crossing installation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents