Similar Projects
Well and Booster Pump Equipment Maintenance Service
Bidding
Goodyear, AZ 85338

N--Install Variable Frequency Drive (VFD) Control Pannel on Pumps @ National Memorial Cemetery of Arizona
Post-Bid
Phoenix, AZ 85024

Chilled and Hot Water Loop Pump Replacement for ARS Maricopa
Post-Bid
Maricopa, AZ 85138

Barney Farms Lake Well and Barney Farms Tank Site Well
Results
Queen Creek, AZ

Pump Maintenance and Repair
Results
Avondale, AZ

Valentine Well
Post-Bid
Phoenix, AZ 85027

Mark Wilmer Pumping Plant Unit 6 Motor Rewind
Results
Less than $3,800,000 est. value
Phoenix, AZ 85024

Dry Well And Interceptor Pumping And Inspection
Post-Bid
Phoenix, AZ

Water Well Equipment and Services
Term Contract
Results
Tempe, AZ 85281

Trailer Mounted Water Pumps
Post-Bid
Phoenix, AZ 85003

Water Wells and Pump Maintenance and Repair Services
Results
$3,000,000 est. value
Scottsdale, AZ

CMAR for Site 20 - New Reservoir, Reservoir Rehabilitation and Direct Well
Post-Bid
Gilbert, AZ 85297

Groundwater Well Cleaning Disinfection Services
Results
$20,000 to $40,000 est. value
Phoenix, AZ 85003

Chilled Water Pump
Post-Bid
Tempe, AZ 85283

Chill Pump Replacements
Results
$25,000 to $100,000 est. value
Maricopa, AZ 85138

Last Updated 08/29/2019 09:37 AM
Project Title

Reservoir, Pump Station and Well Conversion

Physical Address View project details and contacts
City, State (County) Gilbert, AZ 85233   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Construction work, in general, consists of a 4 million gallon (MG) recessed concrete reservoir, pump station, equipping and connecting a previously drilled well (Town Well 30 along Val Vista Drive south of Germann Rd) and completing the connection of a second well (existing Town Well 29 at 156th Street and Willis Road) to the Project reservoir. Well 29 has existing piping to the reservoir site and uses this area for flush to waste retention in order to meet EPA Nitrate MCL levels. The Project components include but are not limited to; recessed concrete reservoir, integral pump station, discharge manifold, valves, pressure gauges, flow meter, enclosed chlorination system with a fixed speed pump and a discharge manifold capable of feeding chlorine to multiple points, air conditioned electrical enclosure with redundant A/C systems housing electrical and PLC equipment, well equipping and booster discharge piping, surge anticipator valving, reservoir mixing, TTHM monitoring, adjustable system backfill capabilities with control valve, TTHM stripping capabilities for backfill water, Nitrate monitoring at Well 30 and the reservoir, VFD driven discharge pumps, reservoir recirculation pump, sun screening for the chlorine building and all instrumentation, Allen Bradley PLC, facilities control descriptions and SCADA design; and other incidental work.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents