Similar Projects
Old Cypress Preserve- Infrastructure
New Construction
Conception
Longs, SC

Hackler Golf Course Cart Paths and Curbing
Infrastructure
Bidding
$420,000 to $480,000 est. value
Conway, SC 29526

Sidewalk Improvements
Post-Bid
Conway, SC

Paving Driveways at PS#2 and PS#11
Infrastructure
Post-Bid
Garden City, Myrtle Beach, SC 29579

MBWWTP Tank Drainage Rehabilitation Submersible Pumps
Results
Myrtle Beach, SC 29579

Arts and Innovation District Phase 1A
Results
Myrtle Beach, SC 29578

Fox Rae Farms - Infrastructure
New Construction
Construction
Conway, SC 29526

Resurfacing, Milling, Indepth Patching, New Parking Lot/Road Grading and Paving, Striping, Stop Bars and Patching on City Streets
Infrastructure
Post-Bid
Conway, SC

South Strand Recreation Center Trails Project
Results
Myrtle Beach, SC 29588

Install Approximately 100 LF of Rolled Curb
Infrastructure
Post-Bid
SC

Ascott Valley Industrial Park Infrastructure
Results
Conway, SC 29526

Mary C. Canty Parking Addition
Infrastructure
Post-Bid
Myrtle Beach, SC 29577

25th Avenue South Header Pipe
Results
Myrtle Beach, SC

Conway WWTP Erosion Control Project
Results
Conway, SC 29526

Ramp Modification
Results
Less than $20,000 est. value
Loris, SC

Last Updated 12/21/2021 11:44 PM
Project Title

HCS Transportation Training Pad

Physical Address View project details and contacts
City, State (County) Conway, SC 29526   (Horry County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work requires the Contractor to furnish all labor, materials, tools, equipment, and incidentals necessary to satisfactorily complete the project as detailed in Exhibit A and associated specifications and plansas provided by Horry County School. The project involves furnishing all labor, materials, tools, and equipment necessary to perform and complete the installation of concrete pad and parking spaces, concrete sidewalks and curb, and all associated utilities and appurtenances, including but not limited to pavement, striping, pedestrian access, fencing, storm water drainage, grassing, stabilization, pond excavation, and site improvements at the following location: HCS Transportation Training Pad. Refer to Exhibit A for further details.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents