Similar Projects
Last Updated | 10/15/2020 01:58 PM |
Project Title | Sewer Lines CIPP |
Physical Address | View project details and contacts |
City, State (County) | San Angelo, TX (Tom Green County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $500,000 to $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sewer Lines CIPP: rehabilitate sewer pipelines by installing Cured in Place Piping (CIPP). Contractor shall furnish all plant, labor, equipment, materials, transportation, services, and incidentals necessary to perform all work necessary to: Repair existing sewer main system to include cleaning and video camera of approximately 3165 linear feet. The sewer mains will be repaired using the Cured in Place Piping (CIPP). There is approximately 1233 LF of 6" pipe, approximately 50 LF of 8" pipe, and approximately 1882 LF of 10" pipe. Approximately 3165 LF of sewer main will be repaired using the CIPP. Bypass pumping is required during the camera and CIPP process. The work will include: Rehabilitate sewer pipelines by installing Cured in Place Piping (CIPP). 1. Flush and clean sanitary sewer pipelines, as required to remove debris and blockages. 2. Provide CCTV video/Pre-TV inspections of existing conditions for all sanitary sewer pipelines. 3. Submit CCTV video/Pre-TV inspections for Government review and approval. 4. Provide new manholes as described in project drawings. 5. Submit CCTV/Post -TV inspection of the new CIIP for all sanitary sewer pipelines. The general description of work does not in any way limit the responsibility of the Contractor to perform Repair Sanitary Sewer Outfalls, all work, plant, supervision, management, quality control, labor, tools, equipment, appliances and material and performance in strict accordance with the specifications, drawings, and subject terms and conditions of each task order and the main contract. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |