Similar Projects
Last Updated | 10/04/2021 09:31 AM |
Project Title | Generator Load Bank Testing |
Physical Address | View project details and contacts |
City, State (County) | Midland, MI (Midland County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide a resistive load bank and make temporary connections for full load test. The load test shall be a 2 hour run time loading generator to 75% of nameplate current. A full set of test results shall be provided to the owner. Test results shall indicate time/date of test, stack temperature, engine temp, volts/phase under load, current/phase under load, hertz under load, ambient temp, oil pressure, unit loaded current, and any other deficiencies of the unit. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |