Similar Projects
Terminal Building Expansion - City of Kearney
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Kearney, NE 68847

Norm Waitt Sr YMCA Family Center And Child Care Expansion
Addition, Demolition, Infrastructure - 11,000 SF
Design
$2,800,000 CJ est. value
South Sioux City, NE 68776

12th Street Water Main Extension
Infrastructure
Bidding
$300,000 CJ est. value
Imperial, NE 69033

12th Street Water Main Extension
Infrastructure
Bidding
$300,000 CJ est. value
Imperial, NE 69033

N-51, US-77 - US-75
Infrastructure
Post-Bid
$5,000,000 to $10,000,000 est. value
NE

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

ACC Overlay Improvements
Infrastructure
Results
Plattsmouth, NE

Oakmont Drive Water Main Improvements
Infrastructure
Results
Plattsmouth, NE 68048

Lexington Veterans Pavilion at Kirkpatrick Memorial Park
Infrastructure
Construction
$1,160,000 CJ est. value
Lexington, NE 68850

WashTech Car Wash / Hastings
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Hastings, NE 68901

Swimming Pool and Bathhouse Construction - Village of Callaway
New Construction, Infrastructure
Pending Verification
$300,000 CJ est. value
Callaway, NE 68825

The Catholic Newman Center
New Construction, Infrastructure - 24,000 SF
Design
$11,600,000 CJ est. value
Kearney, NE 68847

Lagoon and Lift Station Renovations
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Mason City, NE 68855

District 5 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

PC Concrete Pavement Repair
Infrastructure
Results
Plattsmouth, NE

Last Updated 09/22/2022 10:09 AM
Project Title

O'Neill Water Main Improvements Phase 1A

Physical Address View project details and contacts
City, State (County) Oneill, NE 68763   (Holt County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $380,812 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

*The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents