Similar Projects
Borst Park and Hayes Lake Trails - City of Centralia
Infrastructure
Conception
$750,000 CJ est. value
Centralia, WA 98531

SR 507/N of Connor Rd - Culvert Replacement
Infrastructure
Design
$123,000 CJ est. value
Rainier, WA 98576

US 12/Clear Fork Bridge - Expansion Joint, Deck Repair and Overlay
Infrastructure, Renovation
Design
$2,540,000 CJ est. value
Randle, WA 98377

ASRP Riparian Area Planting 2022
Term Contract
Post-Bid
Curtis, WA 98538

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Evergreen Apartment Water System Consolidation
Infrastructure
Results
$248,000 est. value
Onalaska, WA

Mayfield Water System Replacement and Road Realignment
Infrastructure
Results
$2,200,000 est. value
Silver Creek, WA 98585

RFP - Restoration of the Railroad Track
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Chehalis, WA 98532

US 12/Corn Creek Br to 0.5 Miles W of Kosmos Rd - Paving
Infrastructure
Design
$6,245,000 CJ est. value
Morton, WA 98356

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

White Water Takeout Sites Development Project
Infrastructure
Results
$290,000 est. value
Randle, WA

I-5 / SW Parkland Drive to Harrison Ave - Ramp Meters
Infrastructure
Design
$6,600,000 CJ est. value
Chehalis, WA 98532

Dollar General #22900 / Winlock
New Construction, Infrastructure - 10,640 SF
Post-Bid
$3,000,000 CJ est. value
Winlock, WA 98596

2022 Countywide Miscellaneous Safety & Guardrail Project
Infrastructure
Results
$154,335 CJ est. value
Chehalis, WA 98532

Upgrade Yelm Transmission Line to 115-kv - City of Centralia
Infrastructure
Design
$500,000 CJ est. value
Centralia, WA 98531

Last Updated 06/16/2023 01:29 PM
Project Title

China Creek Interceptor - City of Centralia

Physical Address View project details and contacts
City, State (County) Centralia, WA 98531   (Lewis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This section of Fords Prairie Avenue is located in the City's critical aquifer. The extension of approximately 450' of sewer main has the potential to remove approximately 10 septic from the primary source of the City's drinking water. The extension will also provide sewer service connections for potential future development. Project is included in the City of Centralia's FY 2023-2027 CIP Document. Per the owner, as of June 16, 2023, design has not started on this project yet. A timeline for design and bidding has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents