Similar Projects
Front Street Complete Streets Project
Bidding
Melbourne, FL 32901

Road Bond Paving - Kirby Industrial Park and Palm Bay Colony
Infrastructure
Bidding
$1,052,355 est. value
Palm Bay, FL 32905

Pineapple Complete Streets Project
Post-Bid
$1,119,730 est. value
Melbourne, FL 32935

Paving IDIQ, CCSFS
Post-Bid
Cape Canaveral, FL 32925

Milling / Resurfacing / Widening
Results
Less than $838,432 est. value
FL

Road Bond Paving Units 11, 15, 18, 23 and 56
Results
$10,010,151 est. value
Palm Bay, FL 32907

FPL Cocoa Service Center Paving Improvements
Alteration
Bidding
Cocoa, FL 32922

St. Michael Place Extension Phase 3
Post-Bid
Melbourne, FL 32901

Add Left Turn Lane(S)
Results
Less than $1,404,706 est. value
FL

Asphalt Construction, Sealing & Striping
Post-Bid
$300,000 est. value
FL

Economic Development Transportation Project Fund (EDTPF) Infrastructure Improvements Roadway Package
Results
Cape Canaveral, FL 32920

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

CDBG Paving Improvements Project FY 19/20
Results
Titusville, FL 32781

Emergency Roadside Assistance Services (I-95)
Results

Emergency Roadside Assistance Services (SR 528)
Results

Last Updated 09/09/2021 10:39 AM
Project Title

Repair Streets & Parking

Physical Address View project details and contacts
City, State (County) Patrick AFB, FL   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include, but not be limited to: new work, reconstruction, rehabilitation, and repairs. Specialty trade contractors are included in this industry; if they are engaged in activities primarily related to highway, street, and bridge construction (e.g., installing guardrails on highways). This requirement will call for one CLIN. CLIN 0001 will repair streets and various parking locations. Additionally CLIN 0001 will include two additive option plans for construction. Additive option plan one includes all work for the base scope, and is differentiated by the construction of a single lane roundabout at the intersection of Spacelift Street and Matador Street. Additive option plan two will add work on Challenger St. that will call for demolition of paved surfaces, base course, curbing & drainage structures. Option two Installs new road base & grade to provide positive drainage. Plan two also will repave Challenger Street from Falcon St. to Spacelift Ave. & install concrete curbing & drainage structure to include removal of paving & replacing drainage structures to include removal of paving & replace infiltration round concrete piping (RCP) in the parking on the south side of west end of Challenger St. that calls for repaving areas over replaced RCP and installing sod on unpaved disturbed areas. Contractors will provide an independent bid response for all plans associated with CLIN 0001. The government will select the plan that is the most beneficial to the government and results in a complete and usable roadway.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents