Similar Projects
Riverbank Road Bridge Clearing Operations
Term Contract
Results
Stamford, CT

Landscape Services - Esplanades
Infrastructure
Post-Bid
Bridgeport, CT

Exterior Lighting Upgrade and Site Improvements at Elms Village Apartments
Alteration
Post-Bid
East Hartford, CT

Tree Services
Infrastructure
Post-Bid
Manchester, CT

Grounds Keeping, Snow Removal, Retention Pond
Term Contract
Post-Bid
Hartford, CT

2022 Grinding Of Wood, Stumps, Brush And Debris Piles
Infrastructure
Post-Bid
New Milford, CT

Brush Grinding
Term Contract, Alteration
Post-Bid
Woodbury, CT

Landscape and Snow Services - Stamford, Cannondale, Wilton, Merritt 7 Stations
Infrastructure
Post-Bid
New Haven, CT 06511

Fulton Park Tree Work
Infrastructure
Post-Bid
Waterbury, CT 06704

Town Lawns And Athletic Fields Maintenance
Infrastructure
Post-Bid
Oxford, CT

Tree and Brush Trimming and Removal
Term Contract, Infrastructure
Post-Bid
Wallingford, CT

Landscaping Services for DDS- 1 Wintergreen Avenue
Term Contract, Alteration
Post-Bid
Hamden, CT 06517

Last Updated 07/06/2022 07:56 AM
Project Title

Backill of Curb, Fine Grade of Road Shoulder and Establish Turf - FY 22-23

Physical Address View project details and contacts
City, State (County) New Britain, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall consist of placing and compacting clean fill followed by topsoil and seeded with hydro-seed. The work shall be preformed at locations marked by the Town in the field. Non-Curbed Areas - Areas shall be backfilled to a subgrade with clean fill. Topsoil to be placed with a minimum of three (3) inches and raked finished. Areas requiring less than three (3) inches of material shall be fine graded solely with topsoil. The area behind the curb shall be backfilled with clean ill to two (2) inches of the top of curb. Topsoil to be placed with a minimum of three (3) inches and raked finished (The curb is overfilled to allow for settlement.) Hydro-seed shall then be applied. The contractor shall be responsible for the following items: 1) All materials except for the hydro-seed will be provided by the Town of Newtown, and stored at the Highway Garage, 4 Turkey Hill Road. The Town will be responsible for loading all trucks. 2) The Contractor is responsible for picking up materials and delivering them to the site. The Town will not deliver material. 3) Prior to placing ill, areas shall be clean of debris (leaves, sticks, rocks, etc.). Any unsuitable material shall be disposed of at Public Works Garage, 4 Turkey Hill Road, Newtown, CT 4) The contractor shall maintain the roadway in a clean condition. 5) All work is to be completed in a timely matter within the start and completion date as stated in the notice to proceed letter.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents