Similar Projects
Last Updated | 07/24/2019 08:08 AM |
Project Title | 2019 Crack Relief Interlayer, Double Surface Treatment, Patching, Leveling and Plant Mix Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Newnan, GA 30263 (Coweta County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Major Items of Work Consist of: 1. Traffic Control 2. Recycled Asphalt Concrete, Patching, Leveling, 12.5MM, 25MM and Bituminous Tack 3. Bituminous Surface Treatment (Crack Relief Interlayer) 4. Milling Asphalt Concrete Pavement 5. Bituminous Double Surface Treatment with Sand Seal 6. Extra Widening 7. Temporary and Permanent Striping 8. Grading Complete (Shoulder Construction & Mail Box Grading) 9. Grassing, Stabilization and Maintenance of Newly Constructed Shoulders | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |