Similar Projects
Bondecroft Elementary School Addition
Addition
Conception
Sparta, TN 38583

Virtual School Offices Build Out
New Construction, Renovation, Addition, Build-Out
Design
$4,000,000 est. value
TN

Electrical Upgrades Phase I North Elementary School
Renovation
Bidding
Crossville, TN

HVAC Upgrades at Charlotte Park Elementary School
Renovation, Infrastructure
Bidding
Nashville, TN 37209

The Bright School - Phase II
Renovation
Post-Bid
Chattanooga, TN 37405

Catlettsburg Elementary School Four Classrooms
Addition
Post-Bid
Sevierville, TN 37876

Northwest Elementary School
New Construction
Results
Knoxville, TN

Dogwood Elementary School Outdoor Classroom
New Construction
Results
Germantown, TN 38139

Lightbridge Academy
New Construction - 10,568 SF
Construction
$2,840,000 est. value
Hendersonville, TN 37075

Three Rivers Learning Center Expansion
Renovation, Addition - 13,013 SF
Bidding
Newport, TN 37821

District-wide Improvements
Renovation
Post-Bid
Sneedville, TN

Brickey-Mccloud Elementary School
Addition
Results
Knoxville, TN 37918

Westwood And Winstead Elementary - Pump Station - Rehabilitation
Renovation
Bidding
Fairview, Franklin, TN 37064

Greene County Schools Improvement
Renovation
Post-Bid
Afton, Greeneville, Mosheim, TN 37745

Belle Forest ES Gymnasium
Addition
Results
Memphis, TN 38115

Last Updated 03/29/2022 04:05 PM
Project Title

Wilkes Lane Elementary School

Physical Address View project details and contacts
City, State (County) Spring Hill, TN   (Maury County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of the new Wilkes Lane Elementary School in Spring Hill, TN. Contractors will execute turn-key bids to construct a new elementary school which is approximately 121,089 sq. feet. Construction: Masonry bearing walls, both interior and exterior, with brick veneer on exterior walls, concrete slabs on grade with concrete block foundation walls and concrete spread footings. Typical roof construction shall be light gauge prefabricated metal trusses, metal roof deck units and shingles or preformed metal roofing. Second floor structure to be precast concrete planks with concrete topping. Floor finishes include vinyl composition tile, sheet vinyl, resinous flooring, ceramic tile, carpet, or hardwood gym floor. Interior walls will be concrete block or gypsum panels finished with paint. Ceiling shall be lay-in type acoustic tile, gypsum drywall, or exposed structure

Details

Elementary School, 121,089 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents