Similar Projects
Father Roderic J. Dipietro Park
New Construction, Infrastructure, Alteration - 675 SF
Bidding
$547,000 est. value
Hilliard, OH

Multiuse Trail and Driveway Parking Lot Resurfacing
Infrastructure
Bidding
$337,816 est. value
New Albany, OH 43054

Olentangy Trail - Northmoor Park to Clinton Como Park
Post-Bid
Columbus, OH

Ganton Parkway East Phase 2 and Ganton Parkway West Phase 1
Post-Bid
$6,570,000 est. value
New Albany, OH 43054

Northam Road Shared Use Path
Results
Less than $251,669 est. value
Upper Arlington, OH

Installation of a Rectangular Rapid Flashing Beacon, Pedestrian Crossing with Refuge Island and Associated Curb Ramps
Results
$44,771 est. value
Worthington, OH

UIRF Agler Road Sidewalks
Results
Less than $277,273 est. value
Columbus, OH

UIRF 2016 Sidewalks P2
Results
Less than $1,707,075 est. value
Columbus, OH

Alum Creek Trail - Johnstown Road East Side Connector
Results
Columbus, OH

Bexley Parking Lot Repairs
Results
Bexley, OH 43209

2020 Sidewalk Maintenance Program
Results
Upper Arlington, OH

Parking Areas - Expo FY20
Results
OH

Big Walnut Trail - Elk Run to Winchester Pike
Results
Columbus, OH

2020 Sidewalk Reconstruction Program & College Avenue Sidewalk Improvements
Results
$832,000 est. value
Westerville, OH

Pedestrian Safety Neighborhood Sidewalk Gaps, North Linden and South Linden
Results
Less than $312,682 est. value
Columbus, OH

Last Updated 08/26/2021 04:51 PM
Project Title

2021 Pedestrian, Bicycle, and Safety Projects

Physical Address View project details and contacts
City, State (County) Hilliard, OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $290,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Hilliard’s 2021 Pedestrian, Bicycle, and Safety Projects (CIP T-133) includes three separate projects: Alton & Darby Creek Road at Muir Parkway Pedestrian Crossing Improvements, Frazell Road and Rosecliff Drive Pedestrian Crossing Improvements, Davidson Road Pedestrian Crossing Improvements at Vicksburg Lane. Alton & Darby Creek Road at Muir Parkway Pedestrian Crossing Improvements will construct approximately 500 feet of new sidewalk connection along Alton & Darby Creek Road between Fairway Commons Drive and the existing asphalt path north of Lampton Pond Drive. The Project also includes a high visibility crosswalk, a refuge island crossing Alton & Darby Creek Road between Muir Parkway and Fairway Commons Drive, and a rectangular rapid flashing beacon. Bid Schedule lines 1-45 apply to this project. Frazell Road and Rosecliff Drive Pedestrian Crossing Improvements includes the extension of sidewalks along Rosecliff Drive to Frazell Road, signing and pavement markings to provide pedestrian crossing locations at the intersection, curb ramps, and the construction of an asphalt path along the west side of Frazell Road to provide a connection from Rosecliff Drive to Franks Park. Bid Schedule lines 46-80 apply to this project. Davidson Road Pedestrian Crossing Improvements at Vicksburg Lane includes the reconstruction of the concrete driveway at Fr. DiPietro Park, installation of signage and pavement markings to provide a pedestrian crossing across Davidson Road between the driveway and Vicksburg Lane, and construction of curb ramps. Bid Schedule lines 81-104 apply to this project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents