Similar Projects
OR 86: Fish Creek
Renovation
Conception
$4,176,000 est. value
Baker City, OR 97814

Willamette Falls Locks (WFL) Seismic and Safety Upgrades
Renovation
Design
$5,000,000 to $10,000,000 est. value
West Linn, OR 97045

RFP Construction Manager/General Contractor - Roseburg Navigation Center
Build-out
Design
$800,000 CJ est. value
Roseburg, OR 97470

On Call And Emergency Bridge Inspection Qualified Pool
Term Contract
Bidding
Eugene, OR

Cougar Spillway Gate Two Repair
Renovation
Bidding
$5,000,000 to $10,000,000 est. value
McKenzie Bridge, OR

On-Call Repair and Maintenance Services Retainer Contract
Term Contract
Sub-Bidding
Eugene, OR 97401

Redmond And Madras Landscape Maintenance
Infrastructure
Post-Bid
Bend, OR 97703

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Reservoir Replacement Project at Detroit Lake State Park
New Construction
Results
$475,000 est. value
Detroit, OR 97342

Construction Project Cleaning Services
Term Contract
Results
OR

Deschutes County Courthouse Expansion Project
Addition, Term Contract - 38,000 SF
Construction
Bend, OR

Columbia County Emergency Culvert Replacements
Renovation, Infrastructure
Design
$1,862,000 est. value
Saint Helens, OR

On-Call Services for Minor Projects
Alteration
Bidding
Eugene, OR

Uo Retainer Program - Construction Services - Extended Period
Term Contract
Post-Bid
Eugene, OR 97403

Portable Toilets & Servicing
Term Contract, Alteration
Results
OR

Last Updated 07/22/2022 01:03 AM
Project Title

McNary Dam VBS Hatch Cover Assembly

Physical Address View project details and contacts
City, State (County) Umatilla, OR 97882   (Umatilla County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Dam/Tunnel, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK It is the intent of the US Army Corps of Engineers to award a contract to have ONE (1) 4A VBS Hatch Cover assembly, Mounting Hardware, and Support Beam supplied to McNary Dam. FABRICATION OF VBS HATCH COVER ASSEMBLY The Contractor shall manufacture ONE (1) 4A Hatch Cover assembly. VBS Hatch Cover Manufacturing Manufacture ONE (1) hatch cover per drawings S-401. All concrete shall meet specifications 03 40 00.00 28 PRECAST CONCRETE. All steel shall meet specifications 05 05 23.00 28 STRUCTURAL STEEL, METALWORK FABRICATION, AND WELDING. VBS Structural Support Assembly Manufacture ONE (1) hatch cover support assembly per drawing S-402 All steel shall meet specifications 05 05 23.00 28 STRUCTURAL STEEL, METALWORK FABRICATION, AND WELDING. VBS Hardware package Supply ONE (1) set of any hardware needed for the VBS hatch cover and structural support assembly. All hardware shall meet specifications 03 40 00.00 28 PRECAST CONCRETE. All hardware shall meet specifications 05 05 23.00 28 STRUCTURAL STEEL, METALWORK FABRICATION, AND WELDING. 3.0 SUBMTTTALS After acceptance, submittals must include approval drawings for tooling fabrication and seal assembly. NOTE: The Government Technical Point of Contact for this requirement is Mr. Michael Timm. He can be reached at (541) 922-1347 or email to Michael.b.timm@usace.army.mil. Mr. Timm will conduct a site visit during production of the hatch cover to ensure the cover and all accessories meet our technical specifications and all requirements therein. SHIPMENT AND DELIVERY The seal assemblies shall be delivered as FOB Destination. The Contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to McNary Lock and Dam. Delivery of all components shall be within FOURTEEN (14) weeks of award of contract. Shipments are only allowed during normal business hours of Monday - Thursday 7:00am to 4:00pm. All shipments shall be delivered to: McNary Lock and Dam 82790 Devore Rd. Umatilla, OR 97882 The method of contractor selection has not been determined at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents