Similar Projects
Comprehensive Fire Hydrant Maintenance
Term Contract
Bidding
Tinley Park, IL

Water Meter Replacement Program
Infrastructure
Bidding
Harvey, IL

Term Agreement for Water Main Construction - District Two
Term Contract
Post-Bid
Chicago, IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

2021 Roadway Resurfacing and Water Main
Infrastructure
Bidding
Hanover Park, IL

Water Supply Leak Detection Survey
Post-Bid
Park Ridge, IL 60068

Term Agreement for Water Main Construction - District Three
Term Contract
Results
Chicago, IL

Large Meter Testing
Infrastructure
Bidding
Elgin, IL

Basement Water Main Pipe
Renovation
Post-Bid
Park Forest, IL 60466

Term Agreement for Water Main Construction - District One
Term Contract
Results
Chicago, IL

2021 Water System Interconnect Booster Station Procurement
Infrastructure
Bidding
Palatine, IL

On-Call Emergency And Routine Water System Repair Services
Post-Bid
Broadview, Westchester, IL 60155

Water Main Construction - District 4 (Project 20-604)
Term Contract
Results
Chicago, IL

Last Updated 06/22/2021 02:29 PM
Project Title

Water Main Replacement

Physical Address View project details and contacts
City, State (County) Elmwood Park, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Bidding Expected July 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Village of Elmwood Park Water Main Replacement: water main replacement along 77th Avenue and 73rd Court. On 77th Avenue the project extends from Wellington Avenue to Belmont Avenue. The project will retire the existing 6-inch diameter, cast iron watermain on the west side of the street and install 1,025 feet of new 8-inch ductile iron water main on the east side of the street. The connection locations will occur at the northwest corner of Wellington Ave and 77th Ave and the southeast corner of Belmont Ave and 77th Ave. The watermain installation will include four new fire hydrants, installation of three new valves and valve vaults, removal and replacement of fifty-one feet of 8-inch sewer with water main quality pipe to adhere with watermain distancing requirements, and replacing four structures in connection with the new water main quality pipe installed. Pavement patching, resurfacing, and all other necessary restoration is also included in the project scope. On 73rd Court the project extends from North Avenue to Bloomingdale Avenue. The project will retire the existing 6-inch diameter, cast iron water main in the west parkway and install 1,425 feet of new 8-inch ductile iron watermain on the east side of the roadway. The connection locations will occur at the northeast corner of North Ave and 73rd Ct and the northwest corner of Bloomingdale Ave and 73rd Ct. The watermain installation will include four new fire hydrants, installation of two new valves and valve vaults, removal and replacement of one hundred seventy-one feet of 8-inch sewer with water main quality pipe to comply with watermain/sewer distancing requirements, and replacing three structures in connection with the new watermain quality pipe installed. Pavement patching, resurfacing, and all other necessary restoration is also included in the project scope.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents