Similar Projects
Utilities - US 77
Infrastructure
Conception
$1,250,000 CJ est. value
Noble, OK 73068

I-44 - Utilities
Infrastructure
Conception
$885,851 CJ est. value
Norman, OK 73026

Utilities - US 60
Infrastructure
Design
$992,109 CJ est. value
Bluejacket, OK 74333

I-40 - Utilities
Infrastructure
Design
$840,000 CJ est. value
Custer City, OK 73639

Construction of Carter County Maintenance Building
New Construction, Infrastructure
Bidding
$79,799 CJ est. value
Ardmore, OK 73401

Bridge and Approaches - US-183
Infrastructure
Bidding
$9,822,735 CJ est. value
Clinton, OK 73601

First Year Housing - Phase 1
New Construction, Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Norman, OK 73072

Kum & Go #2362 / Tulsa
New Construction, Infrastructure - 5,620 SF
Post-Bid
$2,000,000 CJ est. value
Tulsa, OK 74133

ODOT Water Line Relocation
Infrastructure
Post-Bid
$400,000 CJ est. value
Wapanucka, OK 73461

Water Tower Repair
Renovation
Results
El Reno, OK 73036

Treatment Train Three Filter Influent Flume Rehabilitation Draper Water Treatment Plant
Renovation
Results
$371,043 CJ est. value
Oklahoma City, OK 73165

New Hospital - Cherokee Nation
New Construction, Infrastructure
Construction
$400,000,000 CJ est. value
Tahlequah, OK 74464

Mud Valley Road Waterline Relocations
Infrastructure
Construction
$1,465,563 CJ est. value
Tahlequah, OK 74464

2019 Bond - Edison Elementary Renovations - Bristow Public Schools
Renovation, Infrastructure
Pending Verification
$546,293 CJ est. value
Bristow, OK 74010

Districtwide Improvements - 2019 Bond - Bristow Public Schools
Renovation, Infrastructure
Pending Verification
$510,650 CJ est. value
Bristow, OK 74010

Last Updated 02/06/2023 04:13 PM
Project Title

Water System Improvements - Water Treatment Plant and Storage

Physical Address View project details and contacts
City, State (County) Temple, OK 73568   (Cotton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,929,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include miscellaneous improvements to the water treatment plant and storage facility. All bids must include assurances that the following provisions will be complied with: 1. Federal Labor Standards Provisions, US Department of Labor, 29 CFR 5; Subpart A - DavisBacon Act; Subpart B - Fringe Benefit Provision. 2. Section 3 Final Rule became effective on November 30, 2020, and is codified at 24 CFR part 75. The regulation simplifies the Section 3 requirements and establishes that Section 3 requirements apply to housing rehabilitation, housing construction, and other public construction projects assisted under HUD programs that provide housing and community development financial assistance when the total amount of HUD assistance to the project exceeds a minimum funding threshold. The regulation also improves alignment with current business practices by requiring the reporting of labor hours rather than new hires. The Benchmark Notice establishes the current numeric goals for compliance with Section 3 requirements. 3. Section 109 of the Housing and Community Development Act of 1974, which assures that no person shall, on the grounds of race, color, natural origin, or sex, be excluded from participation in, be denied the benefits or be subjected to discrimination. 4. Non-Segregated Facilities Certification that assures the bidder does not maintain or provide any segregated facilities. 5. Executive Order 11246, EEO provisions require affirmative action and prohibits federal contractors from discriminating on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin. 6. Minority Business Enterprise and Women Business Enterprise provisions which encourage minority-owned business and women-owned businesses to bid on the project. 7. Circular 570 provide assurances that surety companies executing bonds appear on the Treasury Department's list and are authorized to transact business in the State where the project is located. 8. System for Award Management (SAM.gov) Prime contractor's must be registered with no exclusions in the System for Award Management (SAM.gov) to be awarded a contract that includes funding from the federal government. All bids received at said time will be publicly opened and read aloud, and all bids shall remain on file at least forty-eight (48) hours thereafter. Bids received more than ninety-six (96) hours prior to the Bid Opening will be returned. All work shall be performed, and all construction and material used and furnished shall be in accordance with the Contract Documents prepared by Glenn Sullivan & Associates, Inc., and on file in the office of the Town Clerk, located at Town Hall. Contract to be awarded to the low responsive responsible bidder. The Owner reserves the right to waive any informalities in the bidding and the right to reject any and all bids in accordance with the Oklahoma Competitive Bidding Act. Conditional bids shall not be accepted. Notice to Bidders, Form of Bid, Form of Contract, Plans and Specifications, Forms of Bid Bond, Performance and Statutory Payment Bond, and other Contract Documents may be examined at the following: 1. Town Hall 123 N. Commercial St. Temple, OK 73568 (580) 342-6776 Each bidder shall accompany his original bid, with a certified or Cashier's Check on a solvent bank located in Oklahoma or a Bidder's Bond, in the amount of five (5) percent of the amount bid, as a guarantee of his ability to perform the contract bid upon, and that he will enter into a written contract with the Owner to perform said work and/or furnish said materials in accordance with said plans and specifications and furnish the required bonds within seven (7) days after the acceptance of his bid. The deposit will be retained by the Owner as, and for, liquidated damages in case the successful bidder fails to enter in said contract and furnish the required bonds provided for in the specifications within the time required. Deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds. A Performance, Maintenance and Statutory Bond in the amount of 100% of the contract price with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for the faithful performance of the contract, and the bidder shall state in the proposal the name and address of the Surety or Sureties who will sign this bond in case the contract is awarded to him. The Maintenance Bond required will guarantee the repair of all damage due to improper materials or workmanship for a period of one (1) year after the acceptance of the work by the Owner. By submitting a bid/proposal under this solicitation, the Bidder understands that the bid/proposal is subjected to the Davis-Bacon Act including prevailing wage rates and the Contract Work Hours and Safety Standards Act. The work consists of the following items: 1. General - Supply and Install Emergency Generator (Propane) and Automatic Transfer Switch for WTP - Install Fence Around WTP with "No Trespassing" Sign Every 50 ft. - Install New SCADA for WTP and Storage Controls. 2. Raw Water Pump Station - Replace Raw Water Pump. - Rehab Concrete Pump Pad. - Replace Check Valves and Gate Valves on Raw Water Pumps. - Replace Building. 3. Clarifier - Sandblast & Paint Clarifier. 4. Pipe Gallery - Replace Ex. Influent, Backwash Supply, Waste and Surface Wash Valves with Electric Butterfly Valves. - Install Tees, Electric Butterfly Valves, and Piping for Filter to Waste on Each Filter. - Install Mag Meters (Insert) on Each Filter Effluent. - Sandblast and Paint Piping in Pipe Gallery. 5. Filters - Remove and Replace Filter Console. - Install New Filter Headloss Components. - Install two (2) New Chlorine Monitors (Hach CL 17). - Install three (3) New Turbidimeters (Hach TU5300). 6. Chlorine Room - Replace Doors and Jams (2) in Chlorine Room. - Relocate Switches to Outside Chlorine Room. High Service Pump House - Replace Ex. 7.5 HP High Service Pump with 20 HP. - Install 6" Gate Valve and 6" Swing Check for New 20 HP Pump. - Revise Piping for Backup Backwash Pump. - Remove & Replace Exhaust Fan in High Service Pump House - Remove Ex. Window & Install Motorized Intake in High Service Pump House - Remove & Replace Door in High Service Pump House - Remove Ex. Windows & Install CMU in High Service Pump House - Remove Ex. Heater & Patch All Holes in High Service Pump House - Replace Roof, And Remove and Block Up Windows on High Service Pump House - Caulk All Cracks in Int. & Ext. Walls in High Service Pump House - Paint Interior Walls & Piping in High Service Pump House - Paint Exterior of High Service Pump House - Replace Roof, and Remove and Block Up Windows on High Service Pump House 8. Clearwell - Install Hydraulic Mixing System in Clearwell. 9. Storage Facility - Construction Staking. Stake R/W corners at Storage Facility. - Install Fence Around WTP with "No Trespassing" Sign Every 50 ft. - Install Flex Gate on Storage Facility Overflow Pipe. - Install Chlorine Booster at Storage Facility. B. The work is located in Temple, Cotton County, Oklahoma.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents