Similar Projects
U1167 Franklin Street Sewer Rehabilitation Part 2
Infrastructure
Bidding
$792,200 est. value
Evansville, IN 47725

West Side Sanitary Sewer Interceptor, Project 1
Infrastructure
Bidding
Cedar Lake, IN

Jeffersonville CSO Storage Interceptor Phase 3
Post-Bid
Jeffersonville, IN

Sewer Construction Material
Term Contract
Post-Bid
Fort Wayne, IN

Madison Street and 65th Lane Sanitary Sewer Improvement
Results
Merrillville, IN 46410

LTCP Phase 5 - South Region CSO Abatement
Results
Noblesville, IN 46060

Doughty Road Stormwater Improvements
Infrastructure
Bidding
Lawrenceburg, IN 47025

Cass Street Bottleneck Removal
Post-Bid
Peru, IN

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

40 and 8 Lift Station and Force Main Replacement
Renovation, Infrastructure
Bidding
Lafayette, IN

Underground Facility Locating Services
Term Contract
Post-Bid
Anderson, IN 46011

Sanitary Sewer Extension at the Shelbyville AASF/Readiness Center
Results
Shelbyville, IN 46176

Lincoln Drive Trunk Sewer and Pump Station 3 Elimination
Renovation, Infrastructure
Bidding
Clarksville, IN 47129

Riley Pump Station Elimination
Post-Bid
Bedford, IN

I-69 / SR 64 South East Quadrant Sanitary Sewer - Phase 1
Results
$470,000 to $530,000 est. value
Princeton, IN 47670

Last Updated 01/07/2022 01:18 PM
Project Title

2021 Sanitary Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Lafayette, IN   (Tippecanoe County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The installation of approximately 2,525 linear feet (LF) of 8- inch Cured-In-Place Pipe (CIPP), 1,239 LF of 10-inch CIPP, 860 LF of 12-inch CIPP, 87 LF of 18-inch CIPP, 1,586 LF of 36-inch CIPP, and 1,568 LF of 42-inch CIPP, and point repairs all in existing sanitary, storm, and combined sewers. The CIPP lining work shall include lateral reinstatements, removal of protruding laterals, bypass pumping, and traffic maintenance. The Mandatory Add Alternate Bid No. 1 Work shall include 2. The rehabilitation of 13 sanitary sewer manholes consisting of 150.0 vertical feet (VFT) of composite manhole lining, replacement of manhole frames and covers, and chimney/riser reconstructions.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents