Similar Projects
Central Station Alarm Monitoring (CSAM)
Post-Bid

Central Station Alarm Monitoring (CSAM)
Post-Bid

Physical Security/Access Control Systems (PS/AC) Multiple Award Construction Contract (MACC)
Results
Less than $99,000,000 est. value

Physical Security/Access Control Systems (PS/AC) Multiple Award Construction Contract (MACC)
Results
Less than $99,000,000 est. value

Voice Over Ip System Upgrade
Alteration
Post-Bid

RFI - Home Intrusion Detection Systems
Results

Nationwide Alarm Maintenance and Monitoring #3
Term Contract
Post-Bid

Telecommunications Infrastructure Testing Services - Worldwide
Results

LAN CCT Campus Switches, Installation, and Professional Services
Infrastructure
Post-Bid
Bedford, Boston, MA - Chelsea, Portland, ME - Boston, New York, Syracuse, NY - Providence, RI - Hartford, VT 05047

Statewide ITS Communications Network Upgrade Phase 3
Term Contract
Results

Digital Surveillance Systems
Alteration
Post-Bid
$150,000 est. value
Green Cove Springs, FL

Connection of Districts 1, 4, 6 and Turnpike to the Existing Fiber in District 3
Alteration
Results

Broadband Project
Alteration
Results
Green Cove Springs, FL

Citywide SCADA Upgrades at Lift Stations
Alteration
Results
$2,000,000 est. value
Starke, FL

Last Updated 08/17/2022 03:05 PM
Project Title

Camp Blanding Joint Training Center (CBJTC) Wastewater Treatment Plant SCADA Upgrade

Physical Address View project details and contacts
City, State (County) Starke, FL 32091   (Bradford County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

CBJTC Wastewater Treatment Plant SCADA Upgrade Project Location: Camp Blanding Joint Training Center, Starke, FL General Statement of Work: Upgrade 9 pump stations, 4 primary wells, 2 water storage tanks, and the wastewater treatment facility incl electrical distribution related to the mechanical scope, conduits and control cabling to support new SCADA and control upgrades for each site; Install 2 new well pumps and motors; Elevation of discharge piping above grade and relocation flow meters; Update controls to allow for flow pacing of chlorine, automation of well operations based on distribution pressure, automatic cutoff based on totalized daily flow; Replace existing right-angle drives with new 125Kw standby generators and ATS at 2 primary wells; Install new pressure and level sensors for elevated storage tanks; Replace existing altitude valves and butterfly valves on storage tank feed lines and provide new access hatches to the valve vaults; Install new chlorine analyzer system; Connection of new chlorine analyzer and existing feed system to standby power; Install new aviation and safety lighting for elevated storage tanks; Install 4 manual transfer switches for portable generators at 2 of the primary wells and 2 of the water storage tanks; Repair of leaks at existing wet well to prevent groundwater intrusion; Provide upgrades to the SBR treatment train to incl updated PLC controls, new submerged mixers, 1 new drive mechanism for decant arm, and air valves; Replace existing sodium hypochlorite and sodium bisulfite chemical feed systems with new pumps and piping; Repair construction joints in wall of all four basins. Estimated Construction Cost: $2 - $2.4 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The method of Contractor Selection has not been Determined at this time

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents