Similar Projects
Heat Plant Roof RCF 3293
Renovation
Sub-Bidding
$200,000 CJ est. value
Richmond, KY 40475

Government Center Annex and Police Headquarters Roof Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Lexington, KY 40508

FM Paint Shop 0055 Roof Replacement
Renovation, Alteration
Post-Bid
Murray, KY 42071

Control Tower Roof at Carr Creek Lake
Renovation
Post-Bid
$100,000 CJ est. value
Sassafras, KY 41759

Municipal Building Reroof
Alteration
Results
Fort Mitchell, KY

Kinkead Hall - Replace Roof and Gutters & Soffit Repairs
Renovation
Results
$491,750 CJ est. value
Lexington, KY 40508

Toombs Court and Latimer Heights Roof Replacement
Renovation
Construction
$390,000 CJ est. value
Danville, KY 40422

Roof Repairs/Replacement Schwendeman Building
Renovation
Construction
$412,740 CJ est. value
Richmond, KY 40475

Ashland Fire Department: Station 2 Roofing Project
Renovation
Sub-Bidding
$300,000 CJ est. value
Ashland, KY 41101

Powell Roof Maintenance Coating
Alteration
Post-Bid
$100,000 est. value
Richmond, KY 40475

Taylorsville Roof Replacement
Term Contract
Results
Taylorsville, KY 40071

HCWQTC Aeration Blower Building Roof Replacement
Renovation
Sub-Bidding
$150,000 CJ est. value
Louisville, KY 40241

Storage Building Roof
Alteration
Post-Bid
$300,000 est. value
Highland Heights, KY 41076

Dawson Springs Elementary School Partial Reroofing
Alteration
Results
Dawson Springs, KY 42408

Sewer Complex Roof Replacement
Renovation
Sub-Bidding
$230,000 CJ est. value
Hopkinsville, KY 42240

Last Updated 01/05/2024 06:04 PM
Project Title

Roof Replacements KCTCS Gateway Community & Technical College Various Locations

Physical Address View project details and contacts
City, State (County) Florence, KY 41042   (Boone County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $2,167,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Edgewood Campus (Career Center Building) a. Remove existing roof membrane system, skylight and curb down to existing roof deck. Infill skylight opening with new steel framing and decking. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over ridged layer insulation, tapered insulation where indicated and cover board insulation. Provide crickets where indicated. Raise concrete scupper openings where indicated. b. Lighting & Drywall: Modify existing drop ceiling for new drop ceiling, sprinkler and lighting systems. 2. Urban Campus (TIE Building) a. Remove existing roof membrane systems down to existing roof decks. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over ridged layer insulation, tapered insulation where indicated and cover board insulation. Provide crickets where indicated. Install new coping caps, gutters, downspouts, etc. b. Re-point, clean and seal masonry as indicated. 3. Urban Campus (Pro. Services Building) a. Re-point, clean and seal masonry as indicated. b. Re-work scupper for proper drainage 4. Boone Campus (C.A.M. Building) a. Remove loose foil at flashings and overlay new foil faced flashings. b. Re-flash roof drains w/ liquid applied flashing. c. Re-seal pitch pockets w/ pourable sealer 5. Boone Campus (C.A.T. Building) a. Remove loose foil at flashings and overlay new foil faced flashings. b. Re-flash roof drains w/ liquid applied flashing. c. Re-seal pitch pockets w/ pourable sealer d. Repair coping cap joints 6. Boone Campus (Bookstore) a. Remove loose foil at flashings and overlay new foil faced flashings. b. Patch fish-mouth in cap sheet 7. Edgewood (Transportation) a. PVC Roof Overlay The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served. Estimate: $2,167,500.00 Estimated Length of Project: 180 (Substantial Completion) + 30 (Final Completion) All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents