Similar Projects
40th-San Pablo Transit Hub and 40th Street Reconstruction - City of Emeryville
Infrastructure
Conception
$10,787,000 est. value
Emeryville, CA 94608

Castro Valley Boulevard Corridor Improvements from San Miguel Avenue to Stanton Avenue - Alameda County
Infrastructure
Conception
$1,250,000 est. value
Castro Valley, CA 94546

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Grayson Street Life Sciences Facility Development
New Construction, Infrastructure - 187,000 SF
Design
$63,000,000 CJ est. value
Berkeley, CA 94710

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Post-Bid
$75,000,000 CJ est. value
Hayward, CA 94544

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Post-Bid
$75,000,000 CJ est. value
Hayward, CA 94544

Precast Concrete Pavement and HMA
Infrastructure
Results
$57,000,000 est. value
CA

Street Rehabilitation FY 2022
Infrastructure
Results
$5,700,000 est. value
Berkeley, CA 94703

Shattuck Avenue Apartments
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Berkeley, CA 94704

Precast Conc Pvmt, Electronic Toll System, JPCP, CB & Structural Conc
Infrastructure
Construction
$175,969,550 CJ est. value
Sunol, CA 94586

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Sunol Ridge Roadway Reinforcement - Alameda County
Alteration
Conception
$1,000,000 est. value
Castro Valley, CA 94552

1919 Webster Street Commercial Building
Demolition, New Construction, Infrastructure - 520,335 SF
Design
$20,000,000 CJ est. value
Oakland, CA 94612

Rapid Corridors San Pablo Avenue Project
Infrastructure
Post-Bid
Oakland, CA 94622

Last Updated 05/25/2023 10:33 AM
Project Title

Cesar Chavez Safe Routes to School Improvements

Physical Address View project details and contacts
City, State (County) Hayward, CA 94541   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected July 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $197,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000318596 The work consists, in general, of Installing painted curb extensions and remove and restriping travel lanes at three intersections: Whitman Street at Beale Drive, Leidig Court at Tennyson Road, and Whitman Street at Tennyson Road Installing a Rectangular Rapid Flashing Beacon (RRFB) system at one intersection: Whitman Street at Beale Drive Replacing existing pushbuttons with city-furnished touchless Accessible Pedestrian Signal (APS) pushbuttons at two intersections: Whitman Street at Beale Drive and Whitman Street at Tennyson Road Painting curbs red at various locations as shown on the Plans Installing surface mounted channelizers at three intersections: Whitman Street at Beale Drive, Leidig Court at Tennyson Road, and Whitman Street at Tennyson Road Install bike lane markings at one intersection: Whitman Street at Tennyson Road Performing other items or details, not mentioned above, that are required by the plans, and as specified in the Standard Specifications or these Special Provisions Bid Intent Optional Bid Intent Deadline 05/16/2023 05:00 PM EDT Question Acceptance Deadline 05/11/2023 07:00 PM EDT Questions are submitted online No General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Prevailing Wage Required - Warranty Information Required Bonding Requirements - Bid Bond 10 % Contact Information Kevin Yoshiki 510-583-4760 kevin.yoshiki@hayward-ca.gov Kathy Garcia 510-583-4786 Kathy.Garcia@hayward-ca.gov Rachel Patu 510-583-2161 Rachel.Patu@hayward-ca.gov

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents