Similar Projects
Bowie High School - Phase 4 - 2019 Bond - Arlington Independent School District
Addition, Infrastructure, Renovation
Conception
$13,295,613 CJ est. value
Arlington, TX 76018

Bowie High School - Phase 4 - 2019 Bond - Arlington Independent School District
Addition, Infrastructure, Renovation
Conception
$13,295,613 CJ est. value
Arlington, TX 76018

Fort Worth Country Day Lower School
New Construction, Infrastructure - 30,384 SF
Design
$12,862,400 CJ est. value
Fort Worth, TX 76109

Bethlehem Baptist Church
New Construction - 55,000 SF
Design
$25,000,000 est. value
Mansfield, TX

Murphy USA #8610 / Fort Worth
New Construction, Infrastructure - 2,433 SF
Bidding
$2,500,000 CJ est. value
Fort Worth, TX 76133

Water Distribution System South Pearson Lane and Union Church Road East Dove Road Oak Bend Court Loop
Infrastructure
Bidding
$1,350,000 CJ est. value
Southlake, TX 76092

Trail Lakes Apartments
New Construction, Infrastructure - 45,000 SF
Post-Bid
$6,500,000 CJ est. value
Fort Worth, TX 76133

Eagle Mountain-Saginaw ISD Elementary #18: Remaining Trades
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Fort Worth, TX 76179

Trinity Boulevard Phase 1
Infrastructure
Results
$18,000,000 est. value
Fort Worth, TX 76107

Dove at Kirkwood and Carroll at Federal Way Intersection Improvements
Infrastructure
Results
Southlake, TX

Key School
New Construction
Construction
Fort Worth, TX 76119

Murphy Express #8961 / Bedford
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Bedford, TX 76021

Stonemont-Harmon Road / Harmon Road Spec Warehouse
New Construction, Infrastructure - 485,680 SF
Pending Verification
$20,446,233 CJ est. value
Fort Worth, TX 76177

Kirkwood Oaks - Addition and Site
Addition, Demolition, Infrastructure - 4,300 SF
Pending Verification
$2,500,000 CJ est. value
Southlake, TX 76092

Emergency Operations Center (EOC) Relocation Project - City of Southlake
Demolition, New Construction, Infrastructure - 3,000 SF
Conception
$1,703,000 CJ est. value
Southlake, TX 76092

Last Updated 02/23/2023 03:11 PM
Project Title

Fort Worth Nature Center and Refuge Boardwalk Phase II

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76135   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction Nearing Completion, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,330,902 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 22, 2023, the project has been awarded construction is underway and nearing completion, however, information regarding the awarded general contractor and an exact timeline for construction have not been confirmed. M/WBE Goal 18 % The major work will consist of the (approximate) following: The complete replacement of existing parking lot with new concrete parking lot, removal of the existing boardwalk remnants and replacement with expanded Phase II boardwalk with connection to the previously constructed boardwalk, signage, and looped nature trail. Fort Worth Nature Center and Refuge Boardwalk Phase II major work will consist of the replacement of existing parking lot with new concrete parking lot, removal of existing boardwalk remnants and replacement with expanded phase II boardwalk with connection to the previously constructed boardwalk signage and loop nature trial.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents