Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Z--Romo HQE Waterline Rehab Phase 7 & 8
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Estes Park, CO

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Bidding
$300,000 to $400,000 est. value
Estes Park, CO 80517

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Bidding
$300,000 to $400,000 est. value
Estes Park, CO 80517

300 KVA Pad-Mounted Transformers
Post-Bid
Fort Collins, CO

Switchgear and Transformers for Foothills Campus
Post-Bid
Fort Collins, CO 80521

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Foundry Car Chargers Installation
Results
Less than $45,000 est. value
Loveland, CO 80537

Renewable Energy Supply Photovoltaic Solar Generation (PV Solar) and Battery Energy Storage Generation Systems
Alteration
Bidding
Fort Collins, CO

Street and Traffic Stanby Generators
Post-Bid
Fort Collins, CO

P and R 2020 Irrigation Mainline/Lateral Project
Results
Loveland, CO 80537

24-lnch PVC Southeast Waterline Phase 1
Infrastructure
Bidding
Loveland, CO

Backup Generator and Transfer Switch
Post-Bid
Fort Collins, CO

Solar 2020 Power Purchase Agreement (PPA)
Term Contract
Results
Fort Collins, CO 80523

Safe Water Action Program General Contractor
Infrastructure
Bidding
Fort Collins, CO

Last Updated 02/07/2022 06:14 PM
Project Title

Estes Park Campground at Mary's Lake Electrical and Water Distribution System Improvements Phase II

Physical Address View project details and contacts
City, State (County) Estes Park, CO 80517   (Larimer County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project work includes the replacement of secondary electrical distribution to approximately 25 RV hookup sites and the layout of connection pedestals at each RV site. In addition, the project work includes the replacement of water distribution lines and associated yard hydrants in 25 RV hookup sites and 3 additional locations. The Estes Valley Recreation and Park District (EVRPD or District) is seeking services for the construction of Water & Electrical Distribution System Improvements, Phase 2, at the Estes Park Campground at Mary’s Lake, located at 2120 Mary’s Lake Road, Estes Park, CO 80517. This property is located on federal land administered by the Bureau of Reclamation; the District is the managing partner. Project work includes the replacement of secondary electrical distribution to approximately 25 RV hookup sites and the layout of connection pedestals at each RV site. In addition, the project work includes the replacement of water distribution lines and associated yard hydrants in 25 RV hookup sites and 3 additional locations. Work can begin March 1, 2022 and must be completed no later than May 13th, 2022

Details

Division 26 - Electrical.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents