Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Intersection - SUM-Wooster Road Robinson
Infrastructure
Bidding
$1,248,937 est. value

2021 Infrastructure Improvements Contract C
Infrastructure
Bidding
Youngstown, OH 44512

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

321 Mathews Road Asphalt Paving
Results
$29,020 est. value
Youngstown, OH 44505

2020 Resurfacing Program
Results
Less than $125,000 est. value
Poland, OH 44514

MAH-C.R. 151-00.01 South Avenue Resurfacing Phase 1
Infrastructure
Bidding
$1,273,489 est. value
Youngstown, OH 44512

Asphalt Replacement and Repair
Post-Bid
Youngstown, OH

Chip Seal - Chip FY2021
Results

East Newport Drive Resurfacing
Infrastructure
Bidding
Canfield, OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Two Lane Resurfacing - SR 170-00.78/Var
Results
Poland, OH 44514

Commercial Asphalt Resurfacing and Striping Parking Lots
Infrastructure
Post-Bid
Sebring, OH 44672

Two Lane Resurfacing - SR 7-00.00 (Part 1 and Part 2)
Results
OH

Last Updated 02/28/2022 09:15 AM
Project Title

South Cadillac Drive - Phase 2 and Brookfield Avenue Storm Sewer Improvements

Physical Address View project details and contacts
City, State (County) Boardman, OH 44512   (Mahoning County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $235,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of two project areas. At the South Cadillac Drive project area, the work includes dewatering the crossing, excavating the eastern roadway approach to the crossing footing bottom, pouring a concrete plug along the outside edge of the footing, backfilling and replacing the asphalt pavement. At the Brookfield Avenue project area, the work includes replacement of catch basins, storm sewer, and a storm sewer outfall in the right of way and in easement areas. Also included is restoration to existing or better conditions.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents