Similar Projects
Regional WWTP and Collection System - General Construction
New Construction
Bidding
East Earl, PA

Nicklin Pump Station Rehabilitation
Renovation
Bidding
Franklin, PA

Bunker Hill Water Pump Station
Post-Bid
Central City, PA 15926

Eastwood Pump Station Elimination Project
Post-Bid
North East, PA 16428

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Knox Avenue Pumping Station Upgrades
Results
$650,000 est. value
Easton, PA 18043

Kohler Tract Pumping Station - General Construction
Construction
$1,300,000 est. value
Emmaus, PA 18049

Flow Diversion - Pump Stations & Force Main Combined
Construction
North Wales, PA 19436

Talmudic University Booster Station - General Construction
Renovation
Bidding
$195,000 est. value
New Bloomfield, PA 17068

Beeson Avenue Pump Station
Post-Bid
Marianna, PA 15345

Commercial Iron Shop and In-Field Services at Transfer Stations 1 & 3
Renovation
Results
Chester, PA

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 1 - General Construction
Construction
$6,000,000 to $8,500,000 est. value
Reading, PA 19601

Cardiff Pump Station Abandonment and Utility
New Construction, Infrastructure
Bidding
Nanty Glo, PA

Penn Estates Lift Station
Post-Bid
East Stroudsburg, PA 18301

Tannersville Tanks and Pump Station Project - General Construction
Results
Less than $5,900,000 est. value
East Stroudsburg, PA 18301

Last Updated 10/21/2021 03:22 PM
Project Title

Hollow Road Pumping Station Grit System Replacement

Physical Address View project details and contacts
City, State (County) Penn Valley, PA   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $225,000 to $275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work The work includes, but is not limited to, demolition of existing grit removal system and associated appurtenances; fabrication and installation of a new grit removal system with associated appurtenances; replacement of metal walkways, steps, and door; installation of new framing and grating at existing channel; temporary sewer bypass; and incidental electrical work.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents