Similar Projects
Last Updated | 12/19/2022 02:37 PM |
Project Title | RFP - Construction Management at Risk - Pendleton-clemson Regional Waste Water Treatment Plant Expansion |
Physical Address | View project details and contacts |
City, State (County) | Pendleton, SC 29670 (Anderson County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Design Development, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $40,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | RFP - Construction Management at Risk - Pendleton-clemson Regional Waste Water Treatment Plant Expansion *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Final Date to Submit Questions November 3, 2022 The Utility is proposing a 3.0 MGD expansion to the existing 2.0 MGD WWTP, bringing the total capacity to 5.0 MGD. The new WWTP facilities shall include all necessary processes to provide high quality effluent water, meeting wastewater treatment standards and all regulations set forth by the South Carolina Department of Health and Environmental Control (SCDHEC). Currently this project will be funded by municipal bonds and SCIIP funds, however there is potential for additional funding sources that will have specific material and labor requirements. The proposed project includes the following general scope of work: Influent pump station (Coarse Screening and new submersible pump station) Headworks (Rotary Drum Screens and Vortex Grit) Biological process (New process basins utilizing an A2O design) Secondary Clarifier demolition, construction, and rehabilitation RAS/WAS Pumping Upgrades Additional tertiary filter installation UV capacity expansion Aerobic digester construction and rehabilitation Drying bed rehabilitation All other ancillary work required for a fully functional facility |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |