Similar Projects
Ogden Regional Airport Terminal Building Expansion & Improvements
Renovation, Addition
Conception
Ogden, UT 84405

Utah State History Museum New North Capitol Building DFCM Construction VBS
New Construction
Design
$14,000,000 est. value
Salt Lake City, UT

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Janitorial Service for Chase Home
Term Contract
Post-Bid
Less than $41,000 est. value
Salt Lake City, UT 84105

Driving Range Tee Box Area Excavation
Post-Bid
Cedar Hills, UT

Facilities Wash Bay
Results
Sandy, UT

College of Health Research Remodel
Renovation
Results
Less than $47,200 est. value
Salt Lake City, UT 84112

Correctional Facility GMP 11 SHO and VDS Buildings
Construction
Layton, UT

New Utah State Correctional Facility GMP 10 Buildings
Post-Bid
Layton, UT

Directional Drilling Service for Forge
Results
Salt Lake City, UT

Correctional Facility GMP 08.01 KEN, MTN, MTP Buildings
Post-Bid
Draper, UT 84020

Zion-Restripe Multiple Park Roads
Results
UT

Weber Center Exterior Wall Cladding/Repair
Post-Bid
Ogden, UT 84401

DFCM Construction - DHS DJJS Salt Lake Valley Youth Center Detention Unit Remodel
Renovation
Results
Less than $910,000 est. value
South Salt Lake, UT 84119

Last Updated 11/24/2021 07:21 AM
Project Title

DFCM Construction - Pre Qualified General - UDC Utah County Community Corrections Center

Physical Address View project details and contacts
City, State (County) Orem, UT 84057   (Utah County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a purchased building in Orem. The renovated will turn the building into a new Community Corrections Center.

Details

Prison/Jail, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents