Similar Projects
Parkside
New Construction
Conception
Tuscaloosa, AL

North Dean Mixed-Use
New Construction
Conception
Auburn, AL 36830

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

Village at Hays Reserve Apartment Complex
New Construction
Design
$60,000,000 est. value
Huntsville, AL 35810

Feathered Oaks Apartments
New Construction, Infrastructure
Bidding
$14,000,000 CJ est. value
Scottsboro, AL 35769

Capstone Village Apartments 105, 106, 329 Renovations
Renovation
Bidding
$2,300,000 CJ est. value
Tuscaloosa, AL 35404

Honeysuckle Place Apartments
New Construction, Infrastructure
Sub-Bidding
$21,000,000 CJ est. value
Dothan, AL 36305

Boardwalk at Research Park
New Construction - 320,943 SF
Post-Bid
$10,000,000 CJ est. value
Huntsville, AL 35806

Zen Living Apartments
New Construction - 19,572 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Madison, AL

Repair of 3 Wind-Damaged Housing Units
Renovation
Results
$48,920 est. value
Sylacauga, AL

Camelia Court Renovations 2021
Renovation
Results
Greenville, AL 36037

Mercantile on Morris a/k/a Founders Station-Phase II
Renovation - 14,000 SF
Construction
Birmingham, AL 35203

Eastwood f/k/a Gardendale
New Construction - 464,308 SF
Construction
$30,000,000 est. value
Gardendale, AL 35071

701-711 S Brundidge Street Residential
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Troy, AL 36081

Rivi Apartments
New Construction
Pending Verification
Foley, AL 36535

Last Updated 12/06/2022 07:41 PM
Project Title

Opp Housing Authority, IQC, Task 8, 2020 CFP, OPP, Alabama - 2017

Physical Address View project details and contacts
City, State (County) Opp, AL 36467   (Covington County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $811,961 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

No bidders bid, plan to rebid but the project it will be on hold for several months. Per Addendum 1 the bid date changed to 3/3/22 at 11am, and the pre bid meeting changed to 2/17/22 at 10am. Per source no change in the documents. Estimate: $400,000.00 A certified check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation, payable to the Housing Authority, or satisfactory bond executed by an acceptable surety on the Bid Bond form contained in the Specifications, or other form acceptable to HUD and the LHA, and in an amount equal to five percent (5%) of the bid shall be submitted with each bid. The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bond(s) in the amount of 100% of the contract amount. All sureties must be authorized to transact business in the State of Alabama and must be listed on the U.S. Treasury Department Circular No. 570 (most current list), published annually listing companies approved to act as surety on bonds securing government contracts, and said surety or sureties must be in accordance with maximum underwriting limits on each contract as specified in the above mentioned Circular No. 570. If documents are not returned, the entire deposit will be forfeited. Prime Contractors may purchase additional sets and subcontractors and material suppliers may purchase sets of the documents for the cost of reproduction which is $50.00 per set. This is not refundable. No partial sets will be issued. Shipping charges are in addition to deposit. Checks shall be made payable to the Opp Housing Authority. Documents may also be obtained from the Architect electronically in a .pdf format, for which a deposit will not be required. No partial sets will be issued. Prime Contractors, subcontractors, and material suppliers who obtain documents in this manner are responsible for providing their full company name, mailing address, email address, phone number, and fax number to the Architect. Prime Contractors, subcontractors, and material suppliers who obtain documents in this manner are also fully responsible for verifying that they have received a complete set of the Contract Forms, Drawings and Specifications. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Specifications must be paid on this Project. The Housing Authority reserves the right to reject any or all bids and to waive any informalities in the bidding. No bids may be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the Housing Authority. The entire project shall be fully completed within 180 consecutive calendar days.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents