Similar Projects
Last Updated | 12/06/2022 07:41 PM |
Project Title | Opp Housing Authority, IQC, Task 8, 2020 CFP, OPP, Alabama - 2017 |
Physical Address | View project details and contacts |
City, State (County) | Opp, AL 36467 (Covington County) |
Category(s) | Residential |
Sub-Category(s) | Apartments/Condominiums |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $811,961 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | No bidders bid, plan to rebid but the project it will be on hold for several months. Per Addendum 1 the bid date changed to 3/3/22 at 11am, and the pre bid meeting changed to 2/17/22 at 10am. Per source no change in the documents. Estimate: $400,000.00 A certified check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation, payable to the Housing Authority, or satisfactory bond executed by an acceptable surety on the Bid Bond form contained in the Specifications, or other form acceptable to HUD and the LHA, and in an amount equal to five percent (5%) of the bid shall be submitted with each bid. The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bond(s) in the amount of 100% of the contract amount. All sureties must be authorized to transact business in the State of Alabama and must be listed on the U.S. Treasury Department Circular No. 570 (most current list), published annually listing companies approved to act as surety on bonds securing government contracts, and said surety or sureties must be in accordance with maximum underwriting limits on each contract as specified in the above mentioned Circular No. 570. If documents are not returned, the entire deposit will be forfeited. Prime Contractors may purchase additional sets and subcontractors and material suppliers may purchase sets of the documents for the cost of reproduction which is $50.00 per set. This is not refundable. No partial sets will be issued. Shipping charges are in addition to deposit. Checks shall be made payable to the Opp Housing Authority. Documents may also be obtained from the Architect electronically in a .pdf format, for which a deposit will not be required. No partial sets will be issued. Prime Contractors, subcontractors, and material suppliers who obtain documents in this manner are responsible for providing their full company name, mailing address, email address, phone number, and fax number to the Architect. Prime Contractors, subcontractors, and material suppliers who obtain documents in this manner are also fully responsible for verifying that they have received a complete set of the Contract Forms, Drawings and Specifications. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Specifications must be paid on this Project. The Housing Authority reserves the right to reject any or all bids and to waive any informalities in the bidding. No bids may be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the Housing Authority. The entire project shall be fully completed within 180 consecutive calendar days. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |