Similar Projects
118th Street and Wilson Boulevard Pump Stations
New Construction
Bidding
$11,000,000 est. value
Jacksonville, FL 32210

Lift Station CA-14 Rehabilitation Improvements Project
Renovation
Bidding
Callaway, FL

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Rolling Hills Subdivision Gravity Sewer, Lift Station and Forcemain
New Construction, Infrastructure
Bidding
$1,210,000 est. value
Loxahatchee, FL

Paradise Village Lift Station
New Construction
Post-Bid
Jacksonville, FL 32220

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Effluent Disposal Project
Construction
Chipley, FL

Boyette Reclaim Water Reservoir High Service Pump Station Upgrades
Renovation
Bidding
Wesley Chapel, FL 33545

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Pump Station Package 23 Improvements
Results
Less than $2,116,000 est. value
Orlando, FL 32801

Last Updated 11/09/2021 10:23 AM
Project Title

S9 and S9a Trash Rake and Pump Station Refurbishments

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, Southwest Ranches, FL 33317   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of a new trash rake collection system on a new bridge with 24” piles and steel sheet pile, along with a precast control building and canal armoring. The project includes a new generator building with auger-cast piles, sheet pile, stairway, and corridor between the stations. The project includes a new fuel overflow collection system with new tank, return piping and utility bridge crossing to the main storage, lube oil tank and fully automated control system. One main pump at S-9 requires the casting and installation of a 10’ diameter stainless-steel impeller, new housing and bearings and refurbishment of the pump

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents