Similar Projects
Roadway Construction and Storm Drainage
Post-Bid
Bernalillo, NM 87004

Construction Services
Post-Bid
Bernalillo, NM 87004

Senior Center Service Access Parking Lot Reconstruction
Results
Las Vegas, NM

SWNARRC - Demo and Construct Pond Kettles
Demolition
Results
$1,000,000 to $250,000 est. value
Dexter, NM 88230

North NM 314 Bike and Pedestrian Improvements
Post-Bid
Los Lunas, NM 87031

Z--Installation of Continuous Channel Drain for Water
Results
$25,000 to $100,000 est. value
Kirtland, NM

Valle de Oro Outlet Structure
Post-Bid
$2,600,000 est. value
Albuquerque, NM 87107

Parking Lots Improvement Project
Results
Less than $745,753 est. value
Clovis, NM

Fairgrounds Drainage and ADA Compliance Plan
Post-Bid
Portales, NM

Calle Baack Roadway and Drainage Improvements
Results
Bernalillo, NM 87004

Sunland Park Street Paving and Sidewalk Construction On-Call
Post-Bid
Sunland Park, NM 88063

City Wide Pond Maintenance
Results
Albuquerque, NM

Sidewalk and Retaining Wall Installation
Post-Bid
Chinle, Red Valley, Window Rock, AZ - Nageezi, Pinedale, Sanostee, Tohatchi, NM 86515

Arroyo Flood Control Authority (Sscafca) Lisbon Channel Improvements Project
Results
Less than $400,242 est. value
Rio Rancho, NM 87124

Altura Avenue Phase III Infrastructure Improvements Project
Post-Bid
Columbus, NM 88029

Reported 02/20/2020 12:00 AM
Project Title

Copper King Trail Improvements

Physical Address View project details and contacts
City, State (County) Red River, NM 87558   (Taos County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in Red River, NM and includes approximately 275 feet unclassified excavation, subgrade preparation, pulverizing, processing, and placement of reclaimed surfacing, valley gutter, hot mix asphalt and items to complete reconstruction of Copper King Trail.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents