Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Outbound Charging Station Substation Foundation / Rivian Automotive
New Construction, Infrastructure
Design
$706,965 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

O'Neil Park & Pool Landscape Project
Infrastructure
Bidding
$435,750 CJ est. value
Bloomington, IL 61701

Lexington CUSD #7 Additions and Renovations
Addition, Demolition, Renovation, Infrastructure
Bidding
$8,000,000 CJ est. value
Lexington, IL 61753

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Ground Maintenance of Public Park
Alteration
Post-Bid
Colfax, IL

Meadows Road (CH 23) Road Reconstruction
Infrastructure
Results
IL

2022 Non-MFT Construction Sections
Infrastructure
Results
IL

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Constitution Trail Extension - Lafayette Street to Hamilton Road - 40100100-70051 - City of Bloomington
Infrastructure
Conception
$320,000 CJ est. value
Bloomington, IL 61704

Chipseal Pavement Resurfacing
Infrastructure
Bidding
$1,506,000 CJ est. value
Bloomington, IL 61701

Last Updated 06/16/2023 08:03 AM
Project Title

Interstate Smart Overlay on I-74

Physical Address View project details and contacts
City, State (County) Bloomington, IL 61704   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $7,968,555 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work included in this section consists primarily of: 1) Traffic Control Set-Up with Real Time Traffic Control Monitoring System; 2) Pavement Patching; 3) Approach Slab Repairs (Partial Depth); 4) Hot-Mix Asphalt Surface Removal, 2 5) Longitudinal Joint Sealant, Half Width; 6) Polymerized Hot-Mix Asphalt Surface Course; 7) Hot-Mix Asphalt Shoulders; 8) Aggregate Wedge Shoulders, Type B; 9) Guardrail Replacement at Morris Avenue, S.N. 057-0116; 10) Permanent Pavement Markings; 11) Shoulder Rumble Strips, 16 12) Raised Reflective Pavement Markers; 13) All other work necessary to complete the construction of this project. 2.615 Miles of Interstate Smart Overlay on I-74 from 0.4 Mile North of I-55 Business to 0.3 Mile East of US 51 at Bloomington and 1-55 Business from I-55 to 0.4 Mile North. Region 3 District 5 Federal Project # NHPP1DSY(203) County(s) McLean Key Route(s) FAI 74A Marked Route(s) 1-74 Section(s) (57-7)RS-3,(57-20)RS-4 State Job #(s) C-95-060-22 PPS #(s) 5-53448-0000 VBP % 0 70 Working Days Questions not accepted as of April 18, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 037 - Interstate Smart Overlay on I-74

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents