Similar Projects
Polyplex USA Phase 1 & 2 Expansion
Addition, Demolition, Infrastructure
Design
$90,000,000 CJ est. value
Decatur, AL 35601

Polyplex USA Phase 1 & 2 Expansion
Addition, Demolition, Infrastructure
Design
$90,000,000 CJ est. value
Decatur, AL 35601

HDPE Waterline Pipe installed
Infrastructure
Bidding
$200,000 CJ est. value
Decatur, AL 35601

New Addition at Brewer High
Addition, Demolition, Infrastructure
Post-Bid
$90,000 CJ est. value
Somerville, AL 35670

Classroom Addition for Union Hill School
Addition, Demolition, Infrastructure
Post-Bid
$35,000 CJ est. value
Somerville, AL 35670

A New Parking Deck
New Construction, Infrastructure
Results
$9,888,519 CJ est. value
Decatur, AL 35601

Morgan County Parks & Recreation Concession & Restroom Building
Infrastructure
Results
$500,000 CJ est. value
Decatur, AL 35601

New Union Hill Elementary School - Morgan County Schools
New Construction, Infrastructure
Pending Verification
$12,500,000 CJ est. value
Somerville, AL 35670

Falkville Senior Citizens Center
Addition, Demolition, Renovation, Infrastructure - 4,800 SF
Pending Verification
$500,000 CJ est. value
Falkville, AL 35622

Founders Park Sound and Light Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Decatur, AL 35601

Eva Sewer Extension - Highway 35 North
Infrastructure
Results
$153,377 CJ est. value
Eva, AL 35621

First Solar Inc Photovoltaic (PV) Solar Module Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$1,100,000,000 CJ est. value
Decatur, AL 35601

River Port Warehouse Expansion
Addition, Demolition, Infrastructure - 40,000 SF
Post-Bid
$300,000 CJ est. value
Decatur, AL 35601

Micro-Milling, Resurfacing, and Traffic Stripe on SR-36
Infrastructure
Results
$1,497,404 CJ est. value
Hartselle, AL 35640

HDPE Sewer Pipe via Pipebursting Method
Infrastructure
Post-Bid
$600,000 CJ est. value
Decatur, AL 35601

Last Updated 12/28/2022 11:32 AM
Project Title

Beyond Gravity New Production Facility

Physical Address View project details and contacts
City, State (County) Trinity, AL 35673   (Morgan County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant, Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $134,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site Selected has yet to be determined. As of December 28, 2022, the owner announced plans and held a ground breaking for the development. The developer will handle all aspects of construction and a prime contractor has been selected. Information regarding architect or contractor has yet to be announced. Ground work is underway. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

250,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents