Similar Projects
Construction Services for Pioneer Crossing Park – Phase I
New Construction
Bidding
Salt Lake City, UT

SLCO Pioneering Crossing Park Contractor Services Stage 1
Renovation
Bidding
West Valley City, UT

Pickleball Court Construction Project
Post-Bid
Sandy, UT 84070

Columbus Park Improvements
Post-Bid
Salt Lake City, UT 84115

Grand Vistas Park Site Improvements Project
Results
Less than $1,000,000 est. value
West Valley City, UT 84128

Ball Field Preparation
Term Contract
Results
Bluffdale, UT 84065

Skyline High School Baseball Field
Construction
East Millcreek, UT 84109

Taylorsville Mixed Use
New Construction - 40,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Taylorsville, UT

Playground Surfacing Contract
New Construction, Term Contract
Bidding
Salt Lake City, UT

K9 Memorial Dog Park Project
Post-Bid
Herriman, UT 84096

Herriman High Track Resurface
Results
$400,000 to $500,000 est. value
Herriman, UT 84096

Big Bend Park Project
Post-Bid
Herriman, UT 84096

Construction of the Riverton City Dog Park
Results
Less than $300,000 est. value
Riverton, UT 84065

Columbus Park Playground
Post-Bid
Salt Lake City, UT 84115

Galena Hills Dog Park 2020 Improvements
Results
Draper, UT 84020

Reported 04/10/2021 12:00 AM
Project Title

Sunnyvale Park Improvements

Physical Address View project details and contacts
City, State (County) Millcreek, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $300,000 to $400,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 2 : The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. Items of work are as follows: Selective demolition, clearing, grading, playground expansion, play mound addition, play equipment updates, playground curb, playground surfacing, hardscape improvements, custom bench fabrication and installations, site furnishings installation, relocate existing benches, ADA ramp, new concrete pathways, chain link fencing, light poles, bike rack and pavilion lighting and electrical updates and exterior coatings. PHASE 1 : Construction of two fenced in futsal pitches, stormwater management system, lighting system, modifying existing irrigation system, native meadow planting, tree and shrub planting bed preparation, and recovery of lawn areas. Construction will require the demolition of an existing sand volleyball court, clearing and grubbing of existing vegetation, excavation/trenching, and amending existing soils as shown on the plans and as described herein. Work located at approximately 013 South 700 West, Millcreek, Utah. 1. Demolition of an existing sand volleyball court 2. Construction of two fenced in futsal pitches 3. Electrical panel upgrade 4. Lighting system (12) 5. Modifying existing irrigation system 6. Excavation/trenching, and amending existing soils 7. Stormwater management system 8. Clearing and grubbing specified areas 9. Native meadow planting 10. Tree and shrub planting bed preparation 11. Recovery of lawn areas.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents