Similar Projects
Construct Taxiway D Connector Phase 2 for the Trenton-Mercer Airport
Bidding
Ewing Township, NJ 08628

Newark Liberty International Airport - Terminal A Redevelopment Program - Airside Utilities and Paving North - Partial Deconstruction of Terminal
Renovation
Bidding
$230,000,000 to $240,000,000 est. value
Newark, NJ 07114

Atlantic City International Air Apron Rehabilitation
Post-Bid
Hammonton, NJ

Newark Liberty International Airport - Rehabilitation of Runway 4R-22L
Post-Bid
$40,000,000 to $50,000,000 est. value
Newark, NJ 07114

Runway Rubber and Contaminant Removal and Runway/Taxiway Painting at the Atlantic City International Airport
Results
$127,574 est. value
Egg Harbor Township, NJ 08234

Teterboro Airport - Rehabilitation of Runway 6-24
Results
$15,000,000 to $20,000,000 est. value
Teterboro, NJ 07608

Somerset Airport Runway 12 Obstruction Removal
Term Contract
Bidding
Bedminster, NJ 07921

Taxiway B Rehabilitation West End
Post-Bid
Woodbine, NJ

Construction of the Runway 4-22 Rehabilitation at the Essex County Airport
Results
Fairfield, NJ 07004

South Apron Expansion
Results
Millville, NJ 08332

Atlantic City International Airport Runway 13-31 Rehabilitation
Results
Elwood, NJ 08217

Rehabilitate Runway 10-28 Phase I
Results
Cape May, NJ 08024

Rehabilitate Runway 5-23 Improve Runway Safety Area, Phase VI Construction, Morristown Municipal Airport
Results
Morristown, NJ 07960

Taxiway B Rehabilitation Phase 2
Results
Woodbine, NJ 08270

Construct Taxiway D Connector Phase One for the Trenton Mercer Airport
Results
Ewing, NJ 08628

Last Updated 06/24/2021 11:55 AM
Project Title

Rehabilitate Runway 5-23 Improve Runway Safety Area, Phase VIII - (Phase C Construction) Morristown Municipal Airport

Physical Address View project details and contacts
City, State (County) Morristown, NJ 07960   (Morris County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $9,423,150
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is the third phase of a multi-year construction project to Rehabilitate Runway 5-23. This phase of the project includes removal of the existing and installation of a new Medium Intensity Approach Lighting System with RAILs (MALSR), removal of an existing Glide Slope Shelter and installation of a new Glide Slope/MALSR Shelter, installation of new electric service to the Glide Slope/MALSR systems, grading of the extended runway safety area (ERSA), a limited amount of transition paving on the end of the runway and service roads, and removal of an existing and installation of a new cattle guard. The project will include, but is not limited to, limited P-401 paving, grading, installation of lighting and associated electrical work, marking removal and re-marking. The Base Bid and all Bid Additives must be bid.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents