Similar Projects
Saratoga Dignity Care Senior Community and Neighborhood
New Construction, Infrastructure
Design
$55,000,000 est. value
Saratoga Springs, UT 84045

Mountain Medical Center Subdivision
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
North Ogden, UT 84414

Dignity Care Neighborhood
New Construction
Pending Verification
Saratoga Springs, UT 84045

Roy Assisted Living Facility
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Roy, UT 84067

Road To Independence Elevator Renovation
Renovation
Post-Bid
Ogden, UT 84401

Salt Lake County Youth Services Solar Project
Renovation, Alteration
Post-Bid
$250,000 to $300,000 est. value
Salt Lake City, UT 841154345

RFP Design - William E. Christofferson Salt Lake City Veterans Home Replacement Facility
Demolition, New Construction, Infrastructure - 117,500 SF
Post-Bid
$46,500,000 CJ est. value
Salt Lake City, UT 84129

Salina Assisted Living / Salina
New Construction, Infrastructure - 14,966 SF
Post-Bid
$3,000,000 CJ est. value
Salina, UT 84654

Last Updated 12/13/2022 12:14 PM
Project Title

Cadence Active Adult Community

Physical Address View project details and contacts
City, State (County) Hurricane, UT 84737   (Washington County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $83,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a new senior living community. As of December 2022, the project is in the early planning stages, and received approval from the City of Hurricane. No further plans or applications have been submitted for review at this time. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to second quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents