Similar Projects
Interior Renovation Murray Readiness Center
Renovation - 19,310 SF
Bidding
$1,713,375 est. value
Murray, KY 42071

Various Small Construction Projects within the Boundaries of Great Lakes and Ohio River Divisions
Renovation, Addition, Demolition, Term Contract
Post-Bid
Less than $90,000,000 est. value
Chicago, IL - Louisville, KY - Detroit, MI - Allegany, Buffalo, NY - Nashville, TN - Huntington, WV

Ft. Campbell, KY. Dodea Cold Storage Facility
Build-Out
Post-Bid
$500,000 to $1,000,000 est. value
Fort Campbell, KY

Ft. Knox V Corps Repair of a Controlled Area
Renovation
Results
$10,000,000 to $25,000,000 est. value
Fort Knox, KY

Buechel RC Latrine Renovation
Renovation
Results
$326,432 est. value
Louisville, KY 40218

Construct Joint Force Headquarters BNGC
Renovation
Post-Bid
$14,661,586 est. value
Frankfort, KY 40601

Barbourville Readiness Center Latrine Upgrade
Renovation
Results
$1,608,194 est. value
Barbourville, KY 40906

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

Springfield Readiness Center Interior
Renovation
Results
$1,246,573 est. value
Springfield, KY 40069

Fort Campbell Multiple Award Task Order Contract (MATOC)
New Construction
Post-Bid
$250,000 est. value
Fort Campbell, KY

Secure Room
Renovation
Results
$80,450 est. value
Frankfort, KY 40601

SOF MOUT Site Expansion
New Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Fort Campbell, KY

Restoration and Remediation Services
Renovation
Post-Bid
Fort Campbell, KY

Last Updated 04/28/2022 02:08 PM
Project Title

Microgrid Facility

Physical Address View project details and contacts
City, State (County) Fort Campbell, KY   (Christian County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Bidding Expected September 2021
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a complete and usable generation plant capable of operation in both continuous (peak shaving) and standby (islanded) modes in accordance with UFC 3-540-01. The 12,470 volt, 3-phase, 4-wire generation plant shall consist of containerized packaged generators with a combined minimum output capacity of six mega-watts, fueled by a natural gas pipeline. The generators shall be rated to satisfy the 'continuous Power' (peak shaving) and 'Limited Time Running' and 'Emergency Standby Power'(islanded) characteristics prescribed by both UFC 3-540-01 and the Electrical Generating Systems Association (EGSA) 101P for DOD facilities, as applicable. The generators shall have capability and functionality to operate in both continuous (peak shaving) and standby (islanded) modes. Continuous (peak shaving) mode requires that the generator set be able to provide power to a non-varying load for an unlimited number of hours per year. The average power output of the generator set should be 70 -100% of the rating but shall be capable of providing 100% of the rating for 100% of the operating hours. Standby (islanded) mode requires that the generator set be capable of running at an average varying load of up to 70% of the nameplate rating for up to 500 hours per year. The gensets shall be capable of meeting the Army's intent for resiliency in islanded mode, which is a sustained operation per Army Directive 2017-7 for 14 consecutive days, 24 hours per day (368 hours of continuous operations). In standby mode operation, the generators shall be capable of starting and shedding block loads up to 1.1 MW in a single step under the worst-case conditions expected at the site. Transient performance must meet ISO 8528-5:2018 requirements for G3 class with a 1.07 MW block load and each additional load up to 100% of the generator rating. The generator controls shall have remote start, stop, and emergency shutoff capabilities. The generator control system shall be digital and equipped with Ethernet communication ports supporting DNP 3.0 protocols for interfacing with Government Privatized Electrical partner, City Light and Power (CLP) SCADA and control systems. Provide provisions for termination of the fiber optic cable that CLP will provide from the existing CAAF substation to the paralleling switchgear controls. Coordinate fiber connector type with CLP.

Details

Military Facility, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents