Similar Projects
HVAC Contractors
Bidding

HVAC Contractors
Bidding

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Grier Student Center Chiller Replacement
Results
$367,429 est. value
Greenwood, SC

HVAC Renovation for Bldg 174 Aerial Delivery Facility
Results
$250,000 to $500,000 est. value
Charleston, SC 29404

Replace HVAC Systems and Water Heaters at Florence School District 5, Johnsonville Middle School
Post-Bid
$500,000 to $1,000,000 est. value
Johnsonville, SC

Senior Center HVAC System
Results
Central, SC

Sumter Street HVAC Replacement
Post-Bid
$500,000 to $550,000 est. value
Columbia, SC

Geology Building - Repair - Replace Roof Top HVAC Unit
Results
$139,000 est. value
Columbia, SC

HVAC Maintenance Service and Repairs for 2019
Term Contract
Post-Bid
Pineridge, SC

Back-up HVAC System for Server Room
Results
Charleston, SC 29415

Storm Eye Institute Chiller Replacement - Phase II
Post-Bid
$2,000,000 to $3,000,000 est. value
Charleston, SC

Robertson Hall Chiller
Results
$79,810 est. value
Spartanburg, SC

MUSC HCC 4th Floor Mechanical Room Cooling
Post-Bid
Less than $100,000 est. value
Charleston, SC

Reported 01/18/2019 12:00 AM
Project Title

Statewide Indefinite Delivery Contract for Mechanical / Plumbing Construction Services

Physical Address View project details and contacts
City, State (County) State-Wide: SC
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Design-Build. Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description IDC for Mechanical / Plumbing Consruction. Renovation and/or Repair of SCDOT Buildings located throughout the State. IDC's will be awarded to a maximum of four (41 Contractors. Representative project is the Abbeville Engineering Office HVAC Replacement. U12-N125-FW. The Contractor shall have an active South Carolina Mechanical Contractor's License (Group 4 or 51 for Plumbing (PB). Heating (HT). and Air Conditioning (AC1.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents