Similar Projects
Keeney Elementary School Construction
New Construction
Conception
Manchester, CT 06045

Cafeteria Expansion & Alteration
Addition - 1,500 SF
Conception
Farmington, CT

New England Jewish Academy
Addition - 5,000 SF
Design
West Hartford, CT 06117

Burns Latino Studies Academy
New Construction, Infrastructure
Design
$27,873,018 CJ est. value
Hartford, CT 06106

Construction Management Services for Latimer Lane School
Renovation
Post-Bid
Simsbury, CT 06089

School Based Health Centers at Sunset Ridge and Woodland Schools
New Construction, Renovation
Post-Bid
East Hartford, CT 06108

Bowers Elementary School
New Construction, Renovation, Addition - 62,900 SF
Results
$650,000 est. value
Manchester, CT 06042

Construction Management Services for the Renovations to the Anna Reynolds Elementary School
Renovation
Results
$27,516,800 est. value
Newington, CT 06111

Pleasant Valley Elementary School
New Construction - 101,288 SF
Construction
Less than $45,800,000 est. value
South Windsor, CT 06074

Saint Joseph School Annex
Renovation - 13,800 SF
Construction
Hartford, CT 06105

Holmes Elementary School Renovation - City of New Britain
Renovation - 65,912 SF
Conception
$36,000,000 est. value
New Britain, CT 06053

Naubuc School Classroom Reconfiguration
Renovation
Post-Bid
Glastonbury, CT 06033

Norfeldt Elementary School Main Entrance Security Renovations
Renovation
Results
West Hartford, CT 06117

RFQ - Environmental Consulting Service
Term Contract
Conception
New Britain, CT 06051

Anna Reynolds Elementary School Renovation - BP - 1.03, 1.10, 1.12, 1.14, 1.22, and 1.25
Renovation
Post-Bid
$2,000,000 est. value
Newington, CT 06111

Last Updated 03/09/2023 01:01 PM
Project Title

Derynoski, Kelley and Flanders Elementary Schools Improvements or Rebuild - Southington School District

Physical Address View project details and contacts
City, State (County) Southington, CT 06489   (Hartford County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 9, 2023, this project is in the planning phase and pending funding. An architect has not been selected. A firm timeline for construction has not been determined. Plan options include: renovating all three schools, renovating Derynoski, closing Flanders and building a new Kelley, and closing Derynoski and building new Flanders and Kelley schools. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents