Similar Projects
The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Mixed Use Project
New Construction
Conception
$1,150,000 est. value
Salt Lake City, UT 84102

Walmart Supercenter #5350-242 - OGP
Renovation - 108,996 SF
Design
Salt Lake City, UT 84117

Smith's #028-04
Renovation
Design
Salt Lake City, UT 84106

Smith's #153 - Fuel Center
New Construction - 5,651 SF
Bidding
Less than $500,000 CJ est. value
Sandy, UT 84094

Sam's Club #4730-233 - SPRB-R
Renovation - 130,595 SF
Bidding
West Jordan, UT 84084

Slate Multi-Family Mixed Use
New Construction - 123,140 SF
Post-Bid
$5,094,463 est. value
Salt Lake City, UT 84101

Millcreek Commons
Post-Bid
Less than $670,000 est. value
Millcreek, UT 84106

Development of Property at 695 W. 5Th Ave/7555 S. Main Street
New Construction
Results
$1,000,000 to $5,000,000 CJ est. value
Midvale, UT 84047

Walmart Supercenter #3568-232 - OGP-GB2
Renovation - 850 SF
Construction
$37,760 est. value
West Valley City, UT 84120

Mountain View Village Phase II
New Construction - 4,023,000 SF
Construction
Riverton, UT 98096

9th Mixed Use
New Construction - 16,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Salt Lake City, UT 84102

Midas Crossing Retail Center Phase 2
New Construction
Pending Verification
Herriman, UT 84096

Transit Area Mixed Use
New Construction
Conception
Salt Lake City, UT 84111

Smith's #081-01
Renovation
Design
Salt Lake City, UT 84121

Last Updated 05/23/2022 04:44 AM
Project Title

DFCM Construction Standard low Bid - VMA Cemetery Concrete Plaza Replacement

Physical Address View project details and contacts
City, State (County) Bluffdale, UT 84065   (Salt Lake County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing concrete flat work and gutters. Install new concrete flat work and new gutters with improved slope to better shed water. Also install fencing along the canal on the north end of the property. Construction Cost Estimate: $200,000.00

Details

Retail, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents