Similar Projects
Slate Valley Walking Trail
New Construction - 3,600 SF
Design
Less than $15,000 est. value
Poultney, VT 05764

Pearl Street Sidewalk Reconstruction
Bidding
Johnson, VT 05656

Waterville Elementary School Parking Lot Resurfacing
Bidding
Waterville, VT 05492

Slip Formed Concrete Curbing 2020
Post-Bid
Rutland, VT

STP CVRT(2) - Winooski River Bridge and Bike Path Construction
Post-Bid
Montpelier, VT

Milton STP BP16(10) (US Route. 7 Gap Project)
Results
$970,995 est. value
Essex Junction, VT

Sidewalk Replacement Fair Haven Rest Area
Results
Fair Haven, VT

2021 Sidewalk Improvements
Bidding
Springfield, VT

IQ004 Indefinite Delivery / Indefinite Quantity Primary Contracts –Contractor On-Ramp
Post-Bid
Montpelier, VT 05633

Vermont Route 7 Milton Streetscape Project - South
Results
$324,720 est. value
Milton, VT

Sidewalk to Missisquoi Valley Union High School Swanton STP BP19(5)
Post-Bid
Swanton, VT

Design and Construction of Foot Trail at Taconic Mountain Ramble State Park
Results
$25,000 est. value
Hubbardton, VT 05743

Lyndon Town School Sidewalks
Post-Bid
Lyndonville, VT 05851

Kocher Drive - STP Sidewalk (12) and STP BP18(014)
Results
$500,000 to $1,000,000 est. value
Bennington, VT 05201

Concrete Sidewalk Installation
Post-Bid
Rutland, VT 05702

Last Updated 04/02/2020 12:35 PM
Project Title

West Rutland Sidewalk Segments STP BP15(1)

Physical Address View project details and contacts
City, State (County) West Rutland, VT 05777   (Rutland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the construction of new portland cement concrete sidewalks, a bituminous concrete path, granite curbs, drainage improvements, pavement markings, and signs. Locations: 1. Campbell Avenue (T.H. 39)(Class 3): Beginning at main street and ending at Marble Street. 2. Clarendon Avenue (T.H. 2)(Class 2): Beginning at the shared use path, just north of Casella Lane, and ending at Dewey Avenue. 3. Fairview Avenue (T.H. 45)(Class 3): Beginning at the shared use path and ending at the existing sidewalk. 4. Thrall Avenue (T.H. 25)(Class 3): Beginning at Sheldon Avenue and ending at Pleasant Street. 5. Ross Street (T.H. 42)(Class 3): Beginning at Ross Street and ending south of the school.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents