Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

PA 36 to US 22
Infrastructure
Design
$3,940,000 CJ est. value
Hollidaysburg, PA 16648

PA 36 to US 22
Infrastructure
Design
$3,940,000 CJ est. value
Hollidaysburg, PA 16648

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Bedford StReet - Reservoir Road
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
Freedom, Taylor, PA

Rumbles and HFST
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

O'Reilly Auto Parts (AT1) #6625 / Altoona
New Construction, Infrastructure - 7,135 SF
Construction
$1,300,000 CJ est. value
Altoona, PA 16601

O'Reilly Auto Parts (AT1) #6625 / Altoona
New Construction, Infrastructure - 7,135 SF
Construction
$1,300,000 CJ est. value
Altoona, PA 16601

Self Storage - Patton Township
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Altoona, PA 16601

Blair Gap Run Bridge
Demolition, New Construction, Infrastructure
Conception
$3,942,800 CJ est. value
East Freedom, PA 16637

I-99 Newry Pulloff to Plank Rd Intchg
Infrastructure
Design
$11,150,000 CJ est. value
Juniata Township, PA 16635

CIP Waterline Replacement
Infrastructure
Post-Bid
Hollidaysburg, PA

Road Materials
Term Contract
Results
PA

Last Updated 06/03/2023 10:02 AM
Project Title

US 22 - Weller Road to End of 4-Lane

Physical Address View project details and contacts
City, State (County) Frankstown Township, PA 16648   (Blair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,746,240 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This Project is for the Pavement Preservation of Approximately 2.93 Miles of Sr 0022 in Blair County. Work Includes Milling and Resurfacing, Guiderail, Drainage, Tree Removal and Trimming, Rumble Strips, Signing and Pavement Markings and Other Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 0022, Section 057, in Blair County, Frankstown & Catherine Townships at the Locations Indicated on the Plans in the Bid Package. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: RESURFACING/OVERLAYS State Type of Work: Resurfacing/overlays PennDOT - US 22 - Weller Road to End of 4-Lane *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents