Similar Projects
Athens Street Improvements - City of Gainesville
Infrastructure, Alteration
Conception
$250,000 est. value
Gainesville, GA 30501

Mulberry Street Residential Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Flowery Branch, GA 30542

3940 Oakwood Road
New Construction
Design
Oakwood, GA 30566

Sanitary Sewer Ream and Reline (8" DIP)
Infrastructure
Design
$200,000 CJ est. value
Flowery Branch, GA 30542

Candlewood Suites / Oakwood
New Construction, Infrastructure - 56,056 SF
Bidding
$10,000,000 CJ est. value
Oakwood, GA 30566

AutoZone #0914 / Gainesville
New Construction, Infrastructure - 7,000 SF
Post-Bid
$1,500,000 CJ est. value
Gainesville, GA 30501

RFP Construction Manager at Risk - Lyman Hall Elementary - Additions and Renovations 2022
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$26,000,000 CJ est. value
Gainesville, GA 30504

Wauka Mountain Elementary School - Site Improvements
Results
Gainesville, GA 30506

Lanier Elementary- Site Improvements
Infrastructure
Results
Gainesville, GA 30506

Moss Farm
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Lula, GA 30554

Moss Farm
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Lula, GA 30554

Mitchell Street Improvements - City of Flowery Branch
Infrastructure
Conception
$851,126 CJ est. value
Flowery Branch, GA 30542

SR 53 Fm CS 656 / Cedar Ridge Dr to S of SR 211 / Tanner Mill Rd
Infrastructure
Design
$2,000,000 CJ est. value
Gainesville, GA 30501

Industrial Park West - Site Only
New Construction
Post-Bid
$10,000,000 CJ est. value
Gainesville, GA 30501

Flat Creek Water Reclamation Facility (WRF) Raw Sewage Pumps Check Valve Replacement Project
Infrastructure
Results
$111,899 CJ est. value
Gainesville, GA 30504

Last Updated 09/29/2022 11:13 AM
Project Title

Gainesville Street Mixed Residential

Physical Address View project details and contacts
City, State (County) Flowery Branch, GA 30542   (Hall County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $126,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 29, 2022, this project has received a recommendation of approval from the Flowery Branch City Council. Information regarding an architect and general contractor has not been disclosed. Construction could begin in first quarter 2023. The development has a projected build-out date of 2025.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction. New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents