Similar Projects
West Street Sanitary Sewer Facility Improvements
Infrastructure
Bidding
$469,700 CJ est. value
Logan, OH 43138

West Street Sanitary Sewer Facility Improvements
Infrastructure
Bidding
$469,700 CJ est. value
Logan, OH 43138

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Paving Various Hocking County Roads, Logan City Streets, Falls Township and Salt Creek Township Road
Infrastructure
Post-Bid
$200,000 CJ est. value
Logan, OH 43138

Two Lane Resurfacing - SR 664
Infrastructure
Bidding
$2,300,809 CJ est. value
Logan, OH 43138

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Water System Improvements Waterline Replacement
Infrastructure
Bidding
$1,250,000 CJ est. value
Logan, OH 43138

Logan High School Clinic Addition
Addition, Demolition, Infrastructure
Post-Bid
$550,000 CJ est. value
Logan, OH 43138

SR 93 & Front Street Traffic Signals
Infrastructure
Bidding
$211,580 CJ est. value
Logan, OH 43138

West Street C.I. Sanitary Sewer Facility Improvements
Infrastructure
Post-Bid
$381,545 CJ est. value
Falls Township, OH 43138

Hocking Hills State Park - Cedar Falls Parking Improvements
Infrastructure
Bidding
$694,570 CJ est. value
Rockbridge, OH 43149

Resurfacing
Infrastructure
Post-Bid
$200,000 CJ est. value
Benton Township, OH 43152

Cold Mix Level Coating
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Rockbridge, OH 43149

New Construction of Voltolinis Restaurant / Logan
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Logan, OH 43138

Paving
Infrastructure
Post-Bid
$200,000 CJ est. value
Logan, OH 43138

Last Updated 09/19/2023 01:48 PM
Project Title

Sanitary Sewer Improvements - Phase III

Physical Address View project details and contacts
City, State (County) Logan, OH 43138   (Hocking County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $4,915,192 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work shall consist of furnishing all labor, materials, and equipment in accordance with the contract documents. Each bid shall be accompanied by a Bid Guaranty and Contract Bond as required by Section 153.54 of the Ohio Revised Code in an amount equal to the sum of the bid submitted by each contractor. In lieu of posting the bond, a bidder may use a Cashier's Check, Certified Check or Letter of Credit for ten percent of the Contractor's bid as bid security. When a check or letter of credit is used, the bidder shall be required to post a 100 percent Performance Bond and a 100 percent Labor and Material Payment Bond, upon the signing of the contract. Federal Prevailing Wage Rates and Equal Employment Opportunity requirements are applicable to this project. The Owner reserves the right to reject any and all bids, and the right to accept the lowest and best bid, the right to waiver minor irregularities on any bid, and the right to accept the bid proposal which promotes the best in- terest of the Owner. Failure to submit the Bid Guaranty Bond and the re- quired notarized affidavits with the bid shall be cause for considering the bid submission incomplete and for the rejection of the bid. Each bid must contain the full name of the party or parties submitting the bid and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All contractors and subcontractors in- volved with the project will, to the extent practicable use Ohio Products, materials, services, and labor in the implementation of their project. Substantia Completion date for the contract shall be 540 davs from date ofNotice to Proceed. Final Completion date for the contract shall be 570 days from date ofNotice to Proceed. The Project Cost Estimate has been revised to $5,421,180.00

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents