Similar Projects
Reiman Road over Cedar Creek - Replacement - Ottawa County
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Millbury, OH 43447

Roche De Boeuf Interurban - Bridge Inspection
Infrastructure, Renovation
Design
$2,450,000 CJ est. value
Bowling Green, OH 43402

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

Construction of the Bierley Avenue and Water Street South End Loop Waterline Improvements
Infrastructure
Post-Bid
$490,280 est. value
Pemberville, OH 43450

Advanced Manufacturing and Engineering Building
New Construction, Infrastructure - 84,000 SF
Post-Bid
$40,000,000 CJ est. value
Bowling Green, OH 43402

McComb Water Line Replacement - Phase 3
Infrastructure
Results
$807,000 est. value
Bowling Green, OH

NWSD Eastern Henry County Regional Water Main
Alteration
Results
$6,350,000 est. value
Bowling Green, OH

Perrysburg Township Administration Building
New Construction, Renovation, Infrastructure - 8,031 SF
Pending Verification
$2,000,000 CJ est. value
Perrysburg, OH 43551

Abbot Laboratories Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$536,000,000 CJ est. value
Bowling Green, OH 43402

Little Cedar Creek Ditch No. 2484 Improvements
Infrastructure
Bidding
$169,288 CJ est. value
Bowling Green, OH 43402

A New Township Office & Maintenance Building for Freedom Township Trustees
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Pemberville, OH 43450

McClure Waterline Improvements
Infrastructure
Results
$317,548 est. value
Bowling Green, OH

2023 Paving Program
Infrastructure
Bidding
$200,000 CJ est. value
Bowling Green, OH 43402

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Last Updated 03/09/2023 04:13 PM
Project Title

North Main, Broadway, West State, West Water, South Main and I-75 Loop Water Main Replacement

Physical Address View project details and contacts
City, State (County) North Baltimore, OH 45872   (Wood County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $4,774,662 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 9 ,2023 this project has not yet been awarded. A timeline for award has not yet been established.** N. Main, Broadway, W. State, W. Water, S. Main & I-75 Loop Water Main Replacement Wsrla Funded Project Opwc Funded Project Opinion of Probable Construction Cost: $5,090,000.00 Completion Dates: 455 Days From Notice to Proceed for Substantial Completion 500 Days From Notice to Proceed for Final Completion Documents may be ordered by registering and paying portal. Please contact planroom@ ctconsultants.com or call (440) 530-2395 if you encounter any problems viewing, registering or paying for the documents. This project will be funded by the Water Supply Revolving Loan Account Program as administered by the Ohio Environmental Protection Agency and the Ohio Water Development Authority. The Contractor shall note that there are Disadvantaged Business Enterprise participation goals for this project. This procurement is subject to the EPA policy on encouraging the participation of small business in rural areas (SBRAs). All contractors and subcontractors involved with the project will to the extent practicable use Ohio products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123 is required. Domestic steel use requirements as specified in section 153.011 of the revised code apply to this project. Copies of section 153.011 of the revised code can be obtained from the office of the ohio facilities construction commission.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents