Similar Projects
On-Call Plumbing/Sewer & Drain Services
Bidding
Phenix City, AL 36867

On-Call Plumbing Services
Post-Bid
Birmingham, AL 35255

MA-Plumbing Repairs Public Fishing Lakes
Post-Bid
Montgomery, AL 361302620

Z--#521-16-101 Replace Pressure Piping and Hot Water Distribution System
Results
$5,000,000 to $10,000,000 est. value
Birmingham, AL 35233

J--Plumbing Repair
Results
Tuskegee, AL 36083

Replace Fluid Coolers and Underground Loop Piping
Post-Bid
Birmingham, Hoover, AL 35244

Plumbing Repair Services
Results
Less than $67,025 est. value
Montgomery, AL 36104

Plumbing Services
Post-Bid
Montgomery, AL 36104

Plumbing Repair Services
Results
Less than $67,025 est. value
Montgomery, AL

Plumbing Services (Authority Wide)
Post-Bid
Huntsville, AL 35804

Electrical/Plumbing Upgrades for Montgomery County Youth Facility
Results
Montgomery, AL 36108

MA-Statewide Plumbing Department of Transportation
Post-Bid

Merrimack Sports Complex Phase 2
Results
Huntsville, AL 35805

Public Works Building Plumbing Work
Post-Bid
Orange Beach, AL 36561

Plumbing Services
Results
Huntsville, AL

Last Updated 03/03/2021 08:22 AM
Project Title

UAB CPM Plumbing Riser Replacement Phase II

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work generally includes replacement of approximately seven (7) stories of waste and vent stacks, replacement of existing waste and vent pipe above the 3rd floor ceiling that are connected to risers D4 and E4, and associated demolition of architectural features to access existing piping and repair of walls, floors and ceilings, including new partitions and finishes. The work will be performed in occupied areas of an operating Hospital facility under strict infection control, interim life safety, and security requirements to ensure the safety of patients, staff, and contractors. The general contractor should have experience as a general contractor (not as a construction manager, program manager, etc.) with the implementation and maintenance of interim life safety measures and Infection Control provisions in an operating Hospital environment.

Details

Division 09 - Finishes.
Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents