Similar Projects
Kings Bluff Raw Water Pump Station Auxiliary Power Source
Bidding
$735,000 to $740,000 est. value
Wilmington, NC

Decatur Pump Station Abandonment
New Construction
Bidding
Jacksonville, NC

EM Johnson Water Treatment Plant and Remote Pumping Stations Painting Project 2019
Post-Bid
Raleigh, Wendell, NC

CLLC Pump Station And Force Main Improvements
New Construction
Post-Bid
$3,000,000 est. value
Pittsboro, NC

Area 1 Elementary School Off-Site Utilities
Results
Carthage, NC

2018 Wastewater Collection and Treatment Improvements, Contract 2
Results
Less than $2,403,000 est. value
Albemarle, NC

NHRMC Emergency Well House
New Construction - 1,211 SF
Construction
$68,323 est. value
Wilmington, NC 28403

Pump Station #26 And Pump Station #27 Improvements
New Construction
Construction
$500,000 est. value
Wilmington, NC 28401

Hollybrook Pump Station and Force Main
New Construction
Bidding
Wendell, NC 27591

Submersible Sewage Pump - Canterbury Pump Station
Post-Bid
Jacksonville, NC

Wastewater Collection System Rehabilitation
Results
Fremont, NC 27830

Kannapolis Crossing Contract 4 - Booster Pump Station
Bidding
Kannapolis, NC

Lift Station 4259 Repairs
Post-Bid
$1,000,000 to $5,000,000 est. value
Cherry Point, NC 28533

Collection System Odor and Corrosion Control Services
Results
Durham, NC

Landfill Sewage Pumping Station and Force Main
New Construction
Bidding
Smithfield, NC 27577

Last Updated 02/09/2021 09:23 AM
Project Title

Booster Pump Stations #1 and #2 Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Troy, NC 27371   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

One built-in-place pump station, with two vertical turbine pumps and pump cans to replace an existing pump station. In general, the work will include the construction of the complete pump station with building, site work and piping, electrical system and demolition of existing pump station. The second pump station will be included as an additive alternate.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents