Similar Projects
Ajo Way Restaurant and Automobile Sales
New Construction - 7,200 SF
Conception
$1,151,000 est. value
Tucson, AZ 85714

First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

75 Broadway
New Construction
Design
$84,000,000 est. value
Tucson, AZ 85701

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

Steam Pump Ranch BBQ and Bunk Buildings
New Construction, Infrastructure
Bidding
$480,500 CJ est. value
Oro Valley, AZ 85737

Stack Storage / Marana
New Construction, Infrastructure - 90,950 SF
Bidding
$10,000,000 CJ est. value
Marana, AZ 85653

Granada Avenue Hotel Conversion
New Construction, Renovation
Post-Bid
Tucson, AZ 85701

Tangerine Road Corridor Project Interstate 10 to Dove Mountain Boulevard/Twin Peaks Road - Phase 2 - Town of Marana
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Marana, AZ 85658

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Results
$15,495,176 CJ est. value
Tucson, AZ 85706

Martha Cooper Library Expansion
Addition, Demolition, Renovation, Infrastructure - 13,700 SF
Results
$6,608,496 CJ est. value
Tucson, AZ 85712

TOKA 12 Lot Subdivision - San Xavier District
New Construction
Construction
$1,271,309 est. value
Tucson, AZ 85746

Toka Administration Building
Renovation - 5,784 SF
Construction
Sells, AZ 85634

Leonardo Electronics
New Construction - 120,010 SF
Pending Verification
$100,000,000 est. value
Oro Valley, AZ 85704

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

Houghton Road - 22nd Street To Irvington - SR1J - City Of Tucson
Infrastructure
Conception
$40,721,000 CJ est. value
Tucson, AZ 85747

Last Updated 11/09/2022 04:02 PM
Project Title

Rialto Building Modifications

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85701   (Pima County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and renovation of an office development. Renovations include façade modifications, the installation of a new garage door, and the construction of a staircase with a balcony and an access door to a fast-food service. The overall construction work will consist of 264-square-feet. This project with before the Tucson Design and review Board on March 26, 2021 and received a recommendation. The project is still waiting for approval from the city. An architect and general contractor have been selected. A firm construction timeline has not been established, but construction is not expected to begin before third quarter 2021.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents