Similar Projects
Fire Station 41 Reconstruction - PB1823 - City Of Overland Park
Demolition, New Construction, Infrastructure
Conception
$13,000,000 CJ est. value
Overland Park, KS 66204

Neighborhood Park at 159th and Quivira - PR-1875 - City of Overland Park
New Construction, Infrastructure
Conception
$2,150,000 CJ est. value
Overland Park, KS 66204

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

143-Met
New Construction, Infrastructure - 339,070 SF
Design
$93,000,000 CJ est. value
Overland Park, KS 66223

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

2021 Crack Seal Program
Infrastructure
Results
Overland Park, KS

Farmers' Market Pavilion Site
Infrastructure
Results
Overland Park, KS

Bubble Room Coin Operated Laundry / Shawnee
Renovation, Infrastructure - 4,203 SF
Construction
$160,000 CJ est. value
Shawnee, KS 66203

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Azura Credit Union / Mission
Renovation, Infrastructure - 2,295 SF
Pending Verification
$900,000 CJ est. value
Mission, KS 66202

Pizza Hut / Olathe
New Construction, Infrastructure - 1,880 SF
Pending Verification
$570,000 CJ est. value
Olathe, KS 66062

Highland View Literary Park Development - PR-1876 - City of Overland Park
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Overland Park, KS 66221

Lenexa Public Storage
New Construction - 114,729 SF
Design
$10,000,000 CJ est. value
Lenexa, KS 66215

Inland Port Building #61 And #62
New Construction - 1,100,000 SF
Post-Bid
$10,000,000 CJ est. value
Gardner, KS 66030

Last Updated 03/29/2023 10:06 AM
Project Title

Campus Improvements Phase I

Physical Address View project details and contacts
City, State (County) Lenexa, KS 66215   (Johnson County)
Category(s) Commercial, Government/Public, Green Building, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Gas Station, Industrial Warehouse, LEED Certified, Maintenance, Misc. Buildings, Paving/Reconstruction, Site Development, Vehicle Sales/Service, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $12,944,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work at 10747 Renner Blvd and adjacent property 16210 West 108th Street: 1. AW: Modernization of warehouse building, including demolition of existing office space, construction of new offices, exterior building modifications, and mechanical system additions. 2. Vehicle Storage: Procurement and construction of pre-engineered 4-bay vehicular storage facility. 3. Administrative Headquarters: Renovate the existing CMVS office, men's locker room, and adjoining vehicle storage building. Procurement and installation of a new building HVAC system 4. Site Work: Construction of a new private access road, materials laydown yard, site grading and EV charging stations. Description of Project: Design and construction phase services for the detailed design of Phase I of the campus improvements to include tenant improvement of existing office space and locker rooms at the Headquarters Building, addition of a 4-bay vehicle storage building, renovation of existing warehouse and new private drive to access renovated warehouse. B. Work Covered by Contract Documents: Tenant improvement of existing office space and locker rooms at the Headquarters Building, addition of a 4-bay vehicle storage building, renovation of existing warehouse and new private drive to access renovated warehouse.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties, Flagpoles.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents