Similar Projects
Bayard Phase 2B Effluent Reuse Project
Bidding
Bayard, NM

2021 Sewer Manhole Rehabilitation A Unit
Bidding
Roswell, NM

US Highway 550 Sanitary Sewer Tie-In
Post-Bid
Aztec, NM 87410

Construction Services
Post-Bid
Bernalillo, NM 87004

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

West Cedar Street Sewer Line Relocation
Results
$375,000 to $425,000 est. value
Deming, NM 88030

Water Reclamation Facility Effluent Pipeline Replacement
Bidding
Bloomfield, NM 87413

2019-2020 Manhole and Valve Adjustments for Overlay Project
Term Contract
Post-Bid
Las Cruces, NM 88001

Coal Avenue Alley Sewer Line Upgrade and Improvements
Results
Gallup, NM 87301

Construction Services for Isleta Amphitheater Water and Sanitary Sewer Extension
Bidding
Albuquerque, NM

Wastewater System Improvements 2019
Post-Bid
Hagerman, NM 88232

Septic Services
Term Contract
Results
Santa Fe, NM 87505

Installation of a New Residential Septic System
Post-Bid
Bernalillo, NM 87004

Village Sewer Line Improvement Project
Results
$6,874,096 est. value
Albuquerque, NM 87105

Bayard Phase 2B Effluent Reuse Project
Post-Bid
Bayard, NM 88023

Last Updated 01/06/2021 04:22 PM
Project Title

Mescalero Scattered Sites (Martinez & Weinbrenner)

Physical Address View project details and contacts
City, State (County) Mescalero, NM   (Otero County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work located in Mescalero, New Mexico. The work required for the Deborah Weinbrenner and Bryan Martinez sites include, but is not limited to, the following: a.Mobilize to Deborah Weinbrenner site b.Construct new on-site septic system for Deborah Weinbrenner, which includes new sewer service cleanout, new gravity PVC sewer service line, new septic tank with effluent filter, new distribution box, and new EZ-flow drainfield. c.Mobilize to Bryan Martinez site. d.Perform road cut for successful connection to existing water main. Contractor shall provide traffic control plan and implementation in accordance with the permitting agency. Owner will submit permit for road crossing. e.Install new 6-inch gate valve and box. f.Install new 6-inch PVC water main. g.Install new 2-inch flush hydrant and gate valve assembly h.Install new water main tap, service saddle and corp stop. Install new water service line. i.Install new pressure boosting system, complete with electrical system, controls, pump system and insulated enclosure. j.Install buried electrical cable to new booster system. k.Conduct training and startup with the Utility Operations staff for the new pressure boosting system. l.Submit all required testing, documentation, O&M manuals, certifications, and as-built drawings. m.Demobilize and clean-up sites

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents