Project Title | Furnish, Deliver and Installation of Materials and Equipment, as Specified and as Required, to Modify and Make Fully Operational the Existing 100 KW, Three-Phase, 480V, Grid Connected, Roof-Top, Photovoltaic System Installed on the Authority's Operations Building |
Physical Address | View project details and contacts |
City, State (County) | Bayville, NJ 08721 (Ocean County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $148,536 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To modify and make fully operational the existing 100 kW, three-phase, 480V, grid connected, roof-top, photovoltaic system installed on the Authority's Operations Building located at the Central Water Pollution Control Facility (CWPCF), 501 Hickory Lane, Bayville, New Jersey. The work includes, but is not limited to, demolition and removal of damaged inverter and conductors, reconfiguration of the existing solar array strings, furnishing and installing new grid tied inverters, combiners, junction boxes, electric distribution panel and breakers, conduit, conductors, communication equipment and cable, and ancillary equipment and devices. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |