Similar Projects
Grade, Drain and Surface - IS 35
Alteration
Conception
$10,000,000 est. value
Norman, OK 73069

North Choctaw Road, East 66 Highway - 1100 Feet north of the intersection of N Choctaw Road and East 66 Highway (Ward 7) - City of Oklahoma City
New Construction, Demolition, Infrastructure
Conception
$415,000 est. value
Oklahoma City, OK 73054

Fabrication of Coffer Box for Mcclellan-Kerr Arkansas River Navigation
New Construction
Design
$1,000,000 to $5,000,000 est. value
Kerr, AR - Littleton, CO - Broken Arrow, Chouteau, Webbers Falls, OK 74014

Fabrication of Coffer Box for Mcclellan-Kerr Arkansas River Navigation
New Construction
Design
$1,000,000 to $5,000,000 est. value
Kerr, AR - Littleton, CO - Broken Arrow, Chouteau, Webbers Falls, OK 74014

Scott Parker Wentz Tunnel Rehabilitation
Alteration
Post-Bid
Stillwater, OK

Site Preparation Services
Term Contract
Post-Bid
Claremore, OK 74017

Wyandotte Nation - Turtle Hill Estates Phase I
Infrastructure, Alteration
Results
Wyandotte, OK

Summit Lakes Dam Repair CMAR Services
Renovation
Results
Norman, OK 73026

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

Bike Lanes: Along the N. Villa AveNue., N. Youngs Boulevar., and N. Venice Blvd. alignments between NW 62nd St. and NW 10th St.
Infrastructure
Conception
$922,000 est. value
Oklahoma City, OK

Utilities - US 60
Infrastructure
Design
$963,212 CJ est. value
Bluejacket, OK 74333

Webbers Falls Stilling Basin Repairs
Renovation, Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Fort Sill, OK

Sluice Gate & Butterfly Valve Repair at Oologah Lake, Ok
Term Contract
Results
$500,000 to $1,000,000 est. value
Oologah, OK

Deep Fork Greenway Trail - Northeast Oklahoma City (Ward 7)
Infrastructure
Conception
Oklahoma City, OK

Surface - US 54
Infrastructure
Design
$8,000,000 CJ est. value
Guymon, OK 73942

Last Updated 08/30/2022 04:32 AM
Project Title

Shawnee City Lake Dam Repairs

Physical Address View project details and contacts
City, State (County) Shawnee, OK 74801   (Pottawatomie County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all materials, labor, and expenses necessary for the grading and erosion protection improvements as called for in the contract documents. The last date for questions will be August 31st, 2022 Proposals shall be accompanied by a certified check, cashiers check or bid bond equal to five percent (5%) of the total amount of the bid, payable to the City of Shawnee, Oklahoma, as a bid guaranty. The following bonds will be required from the Contractor: Performance Bond equal to the full amount of the contract price; Statutory Bond equal to the full amount of the contract price; Maintenance Bond equal to the full amount of the contract price for a term of one year following acceptance of the project by the City.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents