Similar Projects
Heating Distribution Upgrades - MEP
Bidding
$2,870,000 est. value
Madison, WI 53705

Heating Distribution Upgrades - General
Bidding
$2,870,000 est. value
Madison, WI 53705

Replace Boilers B415
Post-Bid
$10,000,000 to $20,000,000 est. value
Tomah, WI 54660

Boiler Replacement
Post-Bid
Milwaukee, WI 53207

Air Handling Unit Replacement
Results
$240,000 est. value
Barron, WI 54812

Steam Heat Exchanger Replacement
Results
Less than $185,000 est. value
Fox Lake, WI 53933

Arts Sculpture Laboratory - MEP
Bidding
$2,020,000 est. value
Whitewater, WI 53190

High Speed Rubberized Garage Doors
Term Contract
Post-Bid
Milwaukee, WI 53205

Boiler Replacement at Brewster Village
Results
Appleton, WI 54914

Utility Tunnel Steam and Condensate Repairs
Bidding
Waupun, WI 53963

Mechanical Ventilation Installation And Electrical Repair
Renovation
Post-Bid
Waukesha, WI 53146

Domestic Water Heater Replacement
Results
Less than $190,000 est. value
Madison, WI 53703

Plasma Disinfection Modifications
Post-Bid
Waukesha, WI 53146

Utility Renovations
Results
Less than $3,000,000 est. value
Madison, WI 53703

Waukesha County Expo Arena Mechanical Upgrades
Post-Bid
Waukesha, WI 53188

Last Updated 11/02/2020 02:04 PM
Project Title

Air Compressor Replacement

Physical Address View project details and contacts
City, State (County) Madison, WI 53703   (Dane County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of interconnecting piping and instrumentation and 33 low voltage cabling to a new air compressor installed by the State. Piping to be installed includes 34 process air piping, lake water (cooling water) supply and return piping, and compressor drain 35 piping. The work includes supply and installation of pipe supports and pipe insulation. Electrical 36 work consists of installation of a 480V power feed to the compressor, and installation of 37 instrumentation and control wiring from the compressor and system instruments to an existing 38 control panel.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents